IAC Assessment: OR0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product Titanium castings
NAICS n/a
SIC 3369 - Nonferrous Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 52,000
Annual Production 293,469 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,172 5,351,114 kWh $0.04
Natural Gas $54,568 12,486 MMBtu $4.37
TOTAL ENERGY COSTS $523,390
RECOMMENDED SAVINGS* $147,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $130,881
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ MMBtu $ Tgal $ lb
01: 2.2423 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM Savings:
$12,000
Cost:
$19,000
- - $12,000 3,179 - - - - -
-
kWh
$12,000
3,179
MMBtu
-
-
Tgal
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,521
Cost:
$6,281
$2,521 62,134 - - - - - - $2,521
62,134
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 3.4151 MINIMIZE WATER USAGE Savings:
$3,070
Cost:
-
- - - - $3,070 1,835 - - -
-
kWh
-
-
MMBtu
$3,070
1,835
Tgal
-
-
lb
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$122,760
Cost:
$205,000
- - - - - - $122,760 484,300 -
-
kWh
-
-
MMBtu
-
-
Tgal
$122,760
484,300
lb
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$2,530
Cost:
$6,500
- - - - $2,530 12,598 - - -
-
kWh
-
-
MMBtu
$2,530
12,598
Tgal
-
-
lb
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,000
Cost:
$14,000
$5,000 - - - - - - - $5,000
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$147,881
Cost:
$250,781
$7,521 62,134 $12,000 3,179 $5,600 14,433 $122,760 484,300 $7,521
62,134
kWh
$12,000
3,179
MMBtu
$5,600
14,433
Tgal
$122,760
484,300
lb
TOTAL IMPLEMENTED Savings:
$130,881
Cost:
$217,781
$2,521 62,134 - - $5,600 14,433 $122,760 484,300 $2,521
62,134
kWh
-
-
MMBtu
$5,600
14,433
Tgal
$122,760
484,300
lb
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)