Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1995 |
Principal Product | Titanium castings |
NAICS | n/a |
SIC | 3369 - Nonferrous Foundries, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 52,000 |
Annual Production | 293,469 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $221,172 | 5,351,114 | kWh | $0.04 |
Natural Gas | $54,568 | 12,486 | MMBtu | $4.37 |
TOTAL ENERGY COSTS | $523,390 | |||
RECOMMENDED SAVINGS* | $147,881 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $130,881 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2423 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM |
Savings: $12,000 Cost: $19,000 |
- | - | $12,000 | 3,179 | - | - | - | - |
- - kWh |
$12,000 3,179 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,521 Cost: $6,281 |
$2,521 | 62,134 | - | - | - | - | - | - |
$2,521 62,134 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4151 MINIMIZE WATER USAGE |
Savings: $3,070 Cost: - |
- | - | - | - | $3,070 | 1,835 | - | - |
- - kWh |
- - MMBtu |
$3,070 1,835 Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $122,760 Cost: $205,000 |
- | - | - | - | - | - | $122,760 | 484,300 |
- - kWh |
- - MMBtu |
- - Tgal |
$122,760 484,300 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $2,530 Cost: $6,500 |
- | - | - | - | $2,530 | 12,598 | - | - |
- - kWh |
- - MMBtu |
$2,530 12,598 Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,000 Cost: $14,000 |
$5,000 | - | - | - | - | - | - | - |
$5,000 - kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $147,881 Cost: $250,781 |
$7,521 | 62,134 | $12,000 | 3,179 | $5,600 | 14,433 | $122,760 | 484,300 | $7,521 62,134 kWh |
$12,000 3,179 MMBtu |
$5,600 14,433 Tgal |
$122,760 484,300 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $130,881 Cost: $217,781 |
$2,521 | 62,134 | - | - | $5,600 | 14,433 | $122,760 | 484,300 | $2,521 62,134 kWh |
- - MMBtu |
$5,600 14,433 Tgal |
$122,760 484,300 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) |