IAC Assessment: OR0247
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0247
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product Pipes
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 600,000
Annual Production 0 Units
Production Hrs. Annual 7,968
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,494 4,122,509 kWh $0.04
Natural Gas $28,478 5,391 MMBtu $5.28
TOTAL ENERGY COSTS $178,972
RECOMMENDED SAVINGS* $45,637 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,099
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Water Consumption Electricity Usage Solid Waste (non-haz) Water Consumption
$ kWh $ lb $ Tgal
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,230
Cost:
$5,900
$10,230 344,666 - - - - $10,230
344,666
kWh
-
-
lb
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,211
Cost:
$3,000
$2,211 69,461 - - - - $2,211
69,461
kWh
-
-
lb
-
-
Tgal
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$374
Cost:
$521
$374 11,430 - - - - $374
11,430
kWh
-
-
lb
-
-
Tgal
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,538
Cost:
$7,200
$2,538 - - - - - $2,538
-
kWh
-
-
lb
-
-
Tgal
05: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING Savings:
$23,384
Cost:
$10,772
- - - - $23,384 - -
-
kWh
-
-
lb
$23,384
-
Tgal
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$6,900
Cost:
-
- - $6,900 12,000 - - -
-
kWh
$6,900
12,000
lb
-
-
Tgal
TOTAL RECOMMENDED Savings:
$45,637
Cost:
$27,393
$15,353 425,557 $6,900 12,000 $23,384 - $15,353
425,557
kWh
$6,900
12,000
lb
$23,384
-
Tgal
TOTAL IMPLEMENTED Savings:
$43,099
Cost:
$20,193
$12,815 425,557 $6,900 12,000 $23,384 - $12,815
425,557
kWh
$6,900
12,000
lb
$23,384
-
Tgal
Savings
Cost
$ kWh $ lb $ Tgal
Electricity Usage Solid Waste (non-haz) Water Consumption Electricity Usage Solid Waste (non-haz) Water Consumption