IAC Assessment: OR0250
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0250
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product Thermo formed plastics
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 103
Plant Area (Sq.Ft.) 180,000
Annual Production 0 Units
Production Hrs. Annual 2,400
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,083 2,372,802 kWh $0.04
Natural Gas $35,496 6,322 MMBtu $5.61
TOTAL ENERGY COSTS $129,579
RECOMMENDED SAVINGS* $27,663 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,676
#|Description Savings
Cost
Status Electricity Usage Water Disposal Electricity Usage Water Disposal
$ kWh $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$16,311
Cost:
$2,000
$(-1,032) (-34,877) $17,343 2,808 $(-1,032)
(-34,877)
kWh
$17,343
2,808
Tgal
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$5,252
Cost:
$6,500
$5,252 176,729 - - $5,252
176,729
kWh
-
-
Tgal
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,300
Cost:
$600
$2,300 77,374 - - $2,300
77,374
kWh
-
-
Tgal
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$228
Cost:
$523
$228 6,741 - - $228
6,741
kWh
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$365
Cost:
$2,985
$365 9,086 - - $365
9,086
kWh
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$402
Cost:
$500
$402 10,551 - - $402
10,551
kWh
-
-
Tgal
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,805
Cost:
$1,830
$2,805 94,373 - - $2,805
94,373
kWh
-
-
Tgal
TOTAL RECOMMENDED Savings:
$27,663
Cost:
$14,938
$10,320 339,977 $17,343 2,808 $10,320
339,977
kWh
$17,343
2,808
Tgal
TOTAL IMPLEMENTED Savings:
$16,676
Cost:
$4,985
$(-667) (-25,791) $17,343 2,808 $(-667)
(-25,791)
kWh
$17,343
2,808
Tgal
Savings
Cost
$ kWh $ Tgal
Electricity Usage Water Disposal Electricity Usage Water Disposal