IAC logo
IAC Assessment: OR0251
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0251
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product Processed Silicon
NAICS n/a
SIC 3339 - Primary Nonferrous Metals, Nec
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 603,700
Annual Production 14,170 Tons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,646,988 171,979,780 kWh $0.03
Natural Gas $53,852 13,013 MMBtu $4.14
TOTAL ENERGY COSTS $4,700,840
RECOMMENDED SAVINGS* $222,745 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,973
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$69,966
Cost:
$115,000
$69,966 2,810,668 - - $69,966
2,810,668
kWh
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,007
Cost:
$9,588
$4,007 135,111 - - $4,007
135,111
kWh
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,652
Cost:
$17,025
$3,652 142,732 - - $3,652
142,732
kWh
-
-
$
04: 2.2421 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER Savings:
$145,120
Cost:
$1,495,000
$225,120 9,049,824 $(-80,000) - $225,120
9,049,824
kWh
$(-80,000)
-
$
TOTAL RECOMMENDED Savings:
$222,745
Cost:
$1,636,613
$302,745 12,138,335 $(-80,000) - $302,745
12,138,335
kWh
$(-80,000)
-
$
TOTAL IMPLEMENTED Savings:
$73,973
Cost:
$124,588
$73,973 2,945,779 - - $73,973
2,945,779
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes