Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1995 |
Principal Product | Processed Silicon |
NAICS | n/a |
SIC | 3339 - Primary Nonferrous Metals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 603,700 |
Annual Production | 14,170 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $4,646,988 | 171,979,780 | kWh | $0.03 |
Natural Gas | $53,852 | 13,013 | MMBtu | $4.14 |
TOTAL ENERGY COSTS | $4,700,840 | |||
RECOMMENDED SAVINGS* | $222,745 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $73,973 |
#|Description |
Savings Cost |
Status | Electricity Usage | Personnel Changes | Electricity Usage | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $69,966 Cost: $115,000 |
$69,966 | 2,810,668 | - | - |
$69,966 2,810,668 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,007 Cost: $9,588 |
$4,007 | 135,111 | - | - |
$4,007 135,111 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,652 Cost: $17,025 |
$3,652 | 142,732 | - | - |
$3,652 142,732 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2421 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER |
Savings: $145,120 Cost: $1,495,000 |
$225,120 | 9,049,824 | $(-80,000) | - |
$225,120 9,049,824 kWh |
$(-80,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $222,745 Cost: $1,636,613 |
$302,745 | 12,138,335 | $(-80,000) | - | $302,745 12,138,335 kWh |
$(-80,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $73,973 Cost: $124,588 |
$73,973 | 2,945,779 | - | - | $73,973 2,945,779 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Personnel Changes | Electricity Usage | Personnel Changes |