IAC logo
IAC Assessment: OR0253
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0253
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product Plywood
NAICS n/a
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 118
Plant Area (Sq.Ft.) 21,000
Annual Production 125,000 Thousand Feet
Production Hrs. Annual 7,056
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $496,624 13,695,487 kWh $0.04
Natural Gas $189,238 115,950 MMBtu $1.63
TOTAL ENERGY COSTS $685,862
RECOMMENDED SAVINGS* $54,608 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$29,097
Cost:
$26,200
$29,097 - $29,097
-
kWh
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,790
Cost:
$5,000
$2,790 92,907 $2,790
92,907
kWh
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$11,142
Cost:
-
$11,142 338,218 $11,142
338,218
kWh
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,009
Cost:
$2,543
$1,009 28,429 $1,009
28,429
kWh
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,570
Cost:
$35,000
$10,570 383,060 $10,570
383,060
kWh
TOTAL RECOMMENDED Savings:
$54,608
Cost:
$68,743
$54,608 842,614 $54,608
842,614
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage