Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product aluminum disks
NAICS n/a
SIC 3572 - Computer Storage Devices
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 36,000
Annual Production 7,153,976 Pieces
Production Hrs. Annual 6,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,340 2,843,494 kWh $0.04
Natural Gas $10,228 1,907 MMBtu $5.36
TOTAL ENERGY COSTS $113,568
RECOMMENDED SAVINGS* $13,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,893
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,665
Cost:
$2,500
$2,665 - $2,665
-
kWh
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,069
Cost:
$2,353
$1,069 30,481 $1,069
30,481
kWh
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$525
Cost:
$425
$525 17,585 $525
17,585
kWh
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,477
Cost:
-
$2,477 103,165 $2,477
103,165
kWh
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,247
Cost:
-
$2,247 69,168 $2,247
69,168
kWh
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,648
Cost:
$200
$1,648 50,703 $1,648
50,703
kWh
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,299
Cost:
-
$3,299 101,407 $3,299
101,407
kWh
TOTAL RECOMMENDED Savings:
$13,930
Cost:
$5,478
$13,930 372,509 $13,930
372,509
kWh
TOTAL IMPLEMENTED Savings:
$4,893
Cost:
$2,778
$4,893 149,473 $4,893
149,473
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage