IAC logo
IAC Assessment: OR0257
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0257
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product Lead Products
NAICS n/a
SIC 3356 - Nonferrous Rolling And Drawing, Nec
Sales $10,000,000-$50,000,000
# of Employees 41
Plant Area (Sq.Ft.) 48,000
Annual Production 39,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,623 2,208,382 kWh $0.03
Electricity Demand $9,462 6,564 kW-months/year $1.44
Electricity Fees $3,136 - $ -
Natural Gas $56,821 11,009 MMBtu $5.16
TOTAL ENERGY COSTS $153,396
RECOMMENDED SAVINGS* $11,151 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,578
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ Tgal
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$227
Cost:
-
$195 6,448 $32 19 - - - - - - - - $195
6,448
kWh
$32
19
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.2514 COVER OPEN TANKS Savings:
$4,287
Cost:
$540
- - - - - - $4,287 918 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,287
918
MMBtu
-
-
Tgal
-
-
Tgal
03: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$3,097
Cost:
$4,300
$(-114) (-3,810) $(-48) (-29) - - - - $2,581 520,600 $678 - $(-114)
(-3,810)
kWh
$(-48)
(-29)
kW-months/year
-
-
$
-
-
MMBtu
$2,581
520,600
Tgal
$678
-
Tgal
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,286
Cost:
$4,800
- - - - $2,286 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,286
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,254
Cost:
$7,414
$1,057 35,756 $197 119 - - - - - - - - $1,057
35,756
kWh
$197
119
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$11,151
Cost:
$17,054
$1,138 38,394 $181 109 $2,286 - $4,287 918 $2,581 520,600 $678 - $1,138
38,394
kWh
$181
109
kW-months/year
$2,286
-
$
$4,287
918
MMBtu
$2,581
520,600
Tgal
$678
-
Tgal
TOTAL IMPLEMENTED Savings:
$4,578
Cost:
$11,714
$1,138 38,394 $181 109 - - - - $2,581 520,600 $678 - $1,138
38,394
kWh
$181
109
kW-months/year
-
-
$
-
-
MMBtu
$2,581
520,600
Tgal
$678
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Water Consumption