IAC Assessment: OR0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product Manufactured Homes
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $50,000,000-$100,000,000
# of Employees 440
Plant Area (Sq.Ft.) 400,000
Annual Production 1,597 Pieces
Production Hrs. Annual 2,016
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,816 1,521,688 kWh $0.04
Electricity Demand $9,176 4,836 kW-months/year $1.90
Electricity Fees $2,894 - $ -
Natural Gas $24,744 5,248 MMBtu $4.71
TOTAL ENERGY COSTS $286,261
RECOMMENDED SAVINGS* $125,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $125,156
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,397
Cost:
$6,000
$7,813 235,346 $1,584 453 - - - - $7,813
235,346
kWh
$1,584
453
kW-months/year
-
-
$
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$332
Cost:
$1,229
$278 8,499 $54 26 - - - - $278
8,499
kWh
$54
26
kW-months/year
-
-
$
-
-
lb
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$490
Cost:
$1,400
- - - - $490 - - - -
-
kWh
-
-
kW-months/year
$490
-
$
-
-
lb
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$115,427
Cost:
$150,000
$(-2,972) (-89,683) $(-1,101) (-900) - - $119,500 6,800,000 $(-2,972)
(-89,683)
kWh
$(-1,101)
(-900)
kW-months/year
-
-
$
$119,500
6,800,000
lb
TOTAL RECOMMENDED Savings:
$125,646
Cost:
$158,629
$5,119 154,162 $537 (-421) $490 - $119,500 6,800,000 $5,119
154,162
kWh
$537
(-421)
kW-months/year
$490
-
$
$119,500
6,800,000
lb
TOTAL IMPLEMENTED Savings:
$125,156
Cost:
$157,229
$5,119 154,162 $537 (-421) - - $119,500 6,800,000 $5,119
154,162
kWh
$537
(-421)
kW-months/year
-
-
$
$119,500
6,800,000
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)