IAC logo
IAC Assessment: OR0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product Pickles
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 40,000
Annual Production 37,000,000 Pounds
Production Hrs. Annual 4,032
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,273 1,937,280 kWh $0.04
Electricity Demand $18,626 4,968 kW-months/year $3.75
Electricity Fees $5,746 - $ -
Natural Gas $91,943 36,663 MMBtu $2.51
TOTAL ENERGY COSTS $345,799
RECOMMENDED SAVINGS* $100,677 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,705
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,791
Cost:
$2,900
$4,119 114,009 $(-328) (-68) - - - - - - - - $4,119
114,009
kWh
$(-328)
(-68)
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2123 INSULATE FEEDWATER TANK Savings:
$1,450
Cost:
$2,383
- - - - - - $1,450 547 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,450
547
MMBtu
-
-
lb
-
-
$
03: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$1,824
Cost:
$4,012
$1,288 35,756 $536 112 - - - - - - - - $1,288
35,756
kWh
$536
112
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,181
Cost:
$4,000
- - - - $1,181 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,181
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 3.3112 UTILIZE OXIDATION/REDUCTION FOR NEUTRALIZATION Savings:
$92,431
Cost:
$120,000
$(-10,440) (-289,273) $(-1,900) (-396) - - - - $117,121 523,462 $(-12,350) - $(-10,440)
(-289,273)
kWh
$(-1,900)
(-396)
kW-months/year
-
-
$
-
-
MMBtu
$117,121
523,462
lb
$(-12,350)
-
$
TOTAL RECOMMENDED Savings:
$100,677
Cost:
$133,295
$(-5,033) (-139,508) $(-1,692) (-352) $1,181 - $1,450 547 $117,121 523,462 $(-12,350) - $(-5,033)
(-139,508)
kWh
$(-1,692)
(-352)
kW-months/year
$1,181
-
$
$1,450
547
MMBtu
$117,121
523,462
lb
$(-12,350)
-
$
TOTAL IMPLEMENTED Savings:
$95,705
Cost:
$126,395
$(-9,152) (-253,517) $(-1,364) (-284) - - $1,450 547 $117,121 523,462 $(-12,350) - $(-9,152)
(-253,517)
kWh
$(-1,364)
(-284)
kW-months/year
-
-
$
$1,450
547
MMBtu
$117,121
523,462
lb
$(-12,350)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost