Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1996 |
Principal Product | Woolen Textiles |
NAICS | n/a |
SIC | 2231 - Broadwoven Fabric Mills, Wool |
Sales | $10,000,000-$50,000,000 |
# of Employees | 242 |
Plant Area (Sq.Ft.) | 308,521 |
Annual Production | 13,691 Thousand Feet |
Production Hrs. Annual | 3,840 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $241,867 | 10,963,072 | kWh | $0.02 |
Electricity Demand | $104,758 | 27,624 | kW-months/year | $3.79 |
Natural Gas | $257,823 | 101,564 | MMBtu | $2.54 |
TOTAL ENERGY COSTS | $611,126 | |||
RECOMMENDED SAVINGS* | $22,448 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,682 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $10,758 Cost: $29,409 |
$7,285 | 323,857 | $3,473 | 890 | - | - | - | - | - | - | - | - | - | - |
$7,285 323,857 kWh |
$3,473 890 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $1,405 Cost: $8,000 |
$1,405 | 62,427 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,405 62,427 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $3,361 Cost: $22,130 |
- | - | - | - | - | - | $1,618 | 13,480 | $820 | 13,670 | $902 | - | $21 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,618 13,480 lb |
$820 13,670 lb |
$902 - $ |
$21 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1232 KEEP BOILER TUBES CLEAN |
Savings: $6,924 Cost: $59,280 |
- | - | - | - | $6,924 | 2,885 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,924 2,885 MMBtu |
- - lb |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,448 Cost: $118,819 |
$8,690 | 386,284 | $3,473 | 890 | $6,924 | 2,885 | $1,618 | 13,480 | $820 | 13,670 | $902 | - | $21 | - | $8,690 386,284 kWh |
$3,473 890 kW-months/year |
$6,924 2,885 MMBtu |
$1,618 13,480 lb |
$820 13,670 lb |
$902 - $ |
$21 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,682 Cost: $88,689 |
$7,285 | 323,857 | $3,473 | 890 | $6,924 | 2,885 | - | - | - | - | - | - | - | - | $7,285 323,857 kWh |
$3,473 890 kW-months/year |
$6,924 2,885 MMBtu |
- - lb |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Water Consumption |