IAC logo
IAC Assessment: OR0269
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0269
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product Carbonated Beverages
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 76,600
Annual Production 27,544,462 Thousand Gallons
Production Hrs. Annual 4,872
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,058 3,621,337 kWh $0.04
Electricity Demand $41,271 9,960 kW-months/year $4.14
Electricity Fees $6,885 - $ -
Natural Gas $37,204 9,357 MMBtu $3.98
TOTAL ENERGY COSTS $323,223
RECOMMENDED SAVINGS* $92,592 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92,592
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$703
Cost:
$409
- - - - - - $703 185 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$703
185
MMBtu
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,741
Cost:
$6,752
$3,566 97,011 $1,175 245 - - - - - - - - $3,566
97,011
kWh
$1,175
245
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,640
Cost:
$5,700
- - - - $1,640 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,640
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$85,508
Cost:
$330,000
$4,806 130,422 $858 179 - - - - $3,960 32,008 $75,884 - $4,806
130,422
kWh
$858
179
kW-months/year
-
-
$
-
-
MMBtu
$3,960
32,008
lb
$75,884
-
$
TOTAL RECOMMENDED Savings:
$92,592
Cost:
$342,861
$8,372 227,433 $2,033 424 $1,640 - $703 185 $3,960 32,008 $75,884 - $8,372
227,433
kWh
$2,033
424
kW-months/year
$1,640
-
$
$703
185
MMBtu
$3,960
32,008
lb
$75,884
-
$
TOTAL IMPLEMENTED Savings:
$92,592
Cost:
$342,861
$8,372 227,433 $2,033 424 $1,640 - $703 185 $3,960 32,008 $75,884 - $8,372
227,433
kWh
$2,033
424
kW-months/year
$1,640
-
$
$703
185
MMBtu
$3,960
32,008
lb
$75,884
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes