Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1996 |
Principal Product | fruit juice, concentrate, jelly |
NAICS | n/a |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | $50,000,000-$100,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 212,000 |
Annual Production | 14,000,000 Thousand Gallons |
Production Hrs. Annual | 2,040 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $162,887 | 6,533,998 | kWh | $0.02 |
Electricity Demand | $90,264 | 15,504 | kW-months/year | $5.82 |
Electricity Fees | $5,328 | - | $ | - |
Natural Gas | $137,368 | 54,947 | MMBtu | $2.50 |
TOTAL ENERGY COSTS | $615,204 | |||
RECOMMENDED SAVINGS* | $53,880 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,220 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $9,100 Cost: - |
$9,100 | 412,075 | - | - | - | - | - | - | - | - | - | - |
$9,100 412,075 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $22,000 Cost: $5,000 |
$17,000 | 771,102 | $5,000 | 900 | - | - | - | - | - | - | - | - |
$17,000 771,102 kWh |
$5,000 900 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1394 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS |
Savings: $10,070 Cost: $6,000 |
$(-260) | (-11,723) | $(-380) | (-68) | $10,710 | 4,284 | - | - | - | - | - | - |
$(-260) (-11,723) kWh |
$(-380) (-68) kW-months/year |
$10,710 4,284 MMBtu |
- - Tgal |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1232 KEEP BOILER TUBES CLEAN |
Savings: $330 Cost: $500 |
- | - | - | - | $330 | 134 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$330 134 MMBtu |
- - Tgal |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,740 Cost: $16,120 |
$4,170 | 188,746 | $2,570 | 461 | - | - | - | - | - | - | - | - |
$4,170 188,746 kWh |
$2,570 461 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $160 Cost: - |
- | - | - | - | - | - | - | - | $160 | 10,140 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$160 10,140 lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING |
Savings: $5,480 Cost: $3,000 |
$(-640) | (-29,015) | $(-950) | (-170) | - | - | $4,090 | 2,448,000 | - | - | $2,980 | - |
$(-640) (-29,015) kWh |
$(-950) (-170) kW-months/year |
- - MMBtu |
$4,090 2,448,000 Tgal |
- - lb |
$2,980 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,880 Cost: $30,620 |
$29,370 | 1,331,185 | $6,240 | 1,123 | $11,040 | 4,418 | $4,090 | 2,448,000 | $160 | 10,140 | $2,980 | - | $29,370 1,331,185 kWh |
$6,240 1,123 kW-months/year |
$11,040 4,418 MMBtu |
$4,090 2,448,000 Tgal |
$160 10,140 lb |
$2,980 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,220 Cost: $24,120 |
$20,530 | 930,833 | $6,620 | 1,191 | - | - | $4,090 | 2,448,000 | - | - | $2,980 | - | $20,530 930,833 kWh |
$6,620 1,191 kW-months/year |
- - MMBtu |
$4,090 2,448,000 Tgal |
- - lb |
$2,980 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Water Consumption |