IAC logo
IAC Assessment: OR0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product apple juice concentrate
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 41,500
Annual Production 69,772,000 Pounds
Production Hrs. Annual 7,200
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,568 6,148,300 kWh $0.02
Electricity Demand $101,723 17,796 kW-months/year $5.72
Natural Gas $278,738 72,501 MMBtu $3.84
TOTAL ENERGY COSTS $845,148
RECOMMENDED SAVINGS* $271,838 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $247,976
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$11,768
Cost:
$11,600
$(-1,041) (-47,186) $(-1,051) (-192) - - - - $13,860 - $(-1,041)
(-47,186)
kWh
$(-1,051)
(-192)
kW-months/year
-
-
MMBtu
-
-
lb
$13,860
-
Tgal
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$247,053
Cost:
$1,000,000
$(-13,135) (-594,666) $(-4,794) (-864) - - $264,982 882,700 - - $(-13,135)
(-594,666)
kWh
$(-4,794)
(-864)
kW-months/year
-
-
MMBtu
$264,982
882,700
lb
-
-
Tgal
03: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$1,014
Cost:
$1,000
- - - - $1,014 220 - - - - -
-
kWh
-
-
kW-months/year
$1,014
220
MMBtu
-
-
lb
-
-
Tgal
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$923
Cost:
$2,220
$577 4,396 $346 60 - - - - - - $577
4,396
kWh
$346
60
kW-months/year
-
-
MMBtu
-
-
lb
-
-
Tgal
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$11,080
Cost:
$105,000
$9,810 444,314 $1,270 228 - - - - - - $9,810
444,314
kWh
$1,270
228
kW-months/year
-
-
MMBtu
-
-
lb
-
-
Tgal
TOTAL RECOMMENDED Savings:
$271,838
Cost:
$1,119,820
$(-3,789) (-193,142) $(-4,229) (-768) $1,014 220 $264,982 882,700 $13,860 - $(-3,789)
(-193,142)
kWh
$(-4,229)
(-768)
kW-months/year
$1,014
220
MMBtu
$264,982
882,700
lb
$13,860
-
Tgal
TOTAL IMPLEMENTED Savings:
$247,976
Cost:
$1,002,220
$(-12,558) (-590,270) $(-4,448) (-804) - - $264,982 882,700 - - $(-12,558)
(-590,270)
kWh
$(-4,448)
(-804)
kW-months/year
-
-
MMBtu
$264,982
882,700
lb
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Water Consumption