IAC Assessment: OR0273
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0273
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product Zirconium and Titanium Rods
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 150,000
Annual Production 543,000 Pounds
Production Hrs. Annual 8,424
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,934 9,203,400 kWh $0.02
Electricity Demand $107,040 20,388 kW-months/year $5.25
Electricity Fees $764 - $ -
Natural Gas $146,803 33,095 MMBtu $4.44
TOTAL ENERGY COSTS $564,541
RECOMMENDED SAVINGS* $59,179 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,347
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,150
Cost:
$6,000
$7,550 341,735 $2,600 468 - - - - $7,550
341,735
kWh
$2,600
468
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$1,544
Cost:
$1,000
- - - - $1,544 365 - - -
-
kWh
-
-
kW-months/year
$1,544
365
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$803
Cost:
$1,775
$690 31,360 $113 20 - - - - $690
31,360
kWh
$113
20
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$947
Cost:
$5,575
$813 36,928 $134 24 - - - - $813
36,928
kWh
$134
24
kW-months/year
-
-
MMBtu
-
-
lb
05: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$45,735
Cost:
$67,500
$(-1,110) (-32,532) $(-250) (-45) $(-23,122) (-5,363) $70,217 2,414,178 $(-1,110)
(-32,532)
kWh
$(-250)
(-45)
kW-months/year
$(-23,122)
(-5,363)
MMBtu
$70,217
2,414,178
lb
TOTAL RECOMMENDED Savings:
$59,179
Cost:
$81,850
$7,943 377,491 $2,597 467 $(-21,578) (-4,998) $70,217 2,414,178 $7,943
377,491
kWh
$2,597
467
kW-months/year
$(-21,578)
(-4,998)
MMBtu
$70,217
2,414,178
lb
TOTAL IMPLEMENTED Savings:
$2,347
Cost:
$2,775
$690 31,360 $113 20 $1,544 365 - - $690
31,360
kWh
$113
20
kW-months/year
$1,544
365
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)