IAC logo
IAC Assessment: OR0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product powdered milk
NAICS n/a
SIC 2023 - Dry, Condensed, Evaporated Products
Sales $50,000,000-$100,000,000
# of Employees 35
Plant Area (Sq.Ft.) 80,000
Annual Production 80,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $384,440 15,506,155 kWh $0.02
Electricity Demand $152,410 31,752 kW-months/year $4.80
Electricity Fees $9,062 - $ -
Natural Gas $760,986 210,807 MMBtu $3.61
TOTAL ENERGY COSTS $1,317,718
RECOMMENDED SAVINGS* $69,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,150
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$10,640
Cost:
$800
- - - - $11,120 3,080 - - $(-480) - -
-
kWh
-
-
kW-months/year
$11,120
3,080
MMBtu
-
-
lb
$(-480)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,000
Cost:
$128,480
$18,000 726,260 - - - - - - - - $18,000
726,260
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,450
Cost:
$34,810
$11,920 480,657 $4,530 943 - - - - - - $11,920
480,657
kWh
$4,530
943
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,510
Cost:
$11,180
$2,620 105,803 $890 185 - - - - - - $2,620
105,803
kWh
$890
185
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$7,790
Cost:
$2,000
$7,790 314,478 - - - - - - - - $7,790
314,478
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$2,770
Cost:
$5,000
$2,770 111,958 - - - - - - - - $2,770
111,958
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$10,430
Cost:
$50,000
$9,805 395,662 $625 193 - - - - - - $9,805
395,662
kWh
$625
193
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$120
Cost:
-
- - - - - - $120 2,600 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$120
2,600
lb
-
-
$
TOTAL RECOMMENDED Savings:
$69,710
Cost:
$232,270
$52,905 2,134,818 $6,045 1,321 $11,120 3,080 $120 2,600 $(-480) - $52,905
2,134,818
kWh
$6,045
1,321
kW-months/year
$11,120
3,080
MMBtu
$120
2,600
lb
$(-480)
-
$
TOTAL IMPLEMENTED Savings:
$59,150
Cost:
$225,270
$42,345 1,708,382 $6,045 1,321 $11,120 3,080 $120 2,600 $(-480) - $42,345
1,708,382
kWh
$6,045
1,321
kW-months/year
$11,120
3,080
MMBtu
$120
2,600
lb
$(-480)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes