IAC logo
IAC Assessment: OR0287
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0287
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1997
Principal Product Manufactured Homes
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $50,000,000-$100,000,000
# of Employees 458
Plant Area (Sq.Ft.) 240,000
Annual Production 2,854 Pieces
Production Hrs. Annual 5,145
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,999 2,783,705 kWh $0.03
Electricity Demand $2,778 609 kW-months/year $4.56
Electricity Fees $168 - $ -
Natural Gas $63,782 13,296 MMBtu $4.80
TOTAL ENERGY COSTS $679,077
RECOMMENDED SAVINGS* $61,990 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,250
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 3.1172 REVISE RAW MATERIAL SPECS Savings:
$32,300
Cost:
$104,000
- - - - - - - - $32,300 2,291,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$32,300
2,291,000
lb
-
-
$
02: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$17,270
Cost:
-
- - - - - - - - $2,570 182,400 $14,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,570
182,400
lb
$14,700
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$480
Cost:
-
- - - - - - $480 45 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$480
45
gal
-
-
lb
-
-
$
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$260
Cost:
-
- - - - - - - - $260 18,600 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$260
18,600
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,770
Cost:
$2,885
$1,260 46,600 $510 109 - - - - - - - - $1,260
46,600
kWh
$510
109
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
-
Cost:
$2,000
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$450
Cost:
$2,000
$320 12,016 $130 28 - - - - - - - - $320
12,016
kWh
$130
28
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$9,460
Cost:
$134,000
$3,350 123,974 $1,340 289 $4,770 994 - - - - - - $3,350
123,974
kWh
$1,340
289
kW-months/year
$4,770
994
MMBtu
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$61,990
Cost:
$244,885
$4,930 182,590 $1,980 426 $4,770 994 $480 45 $35,130 2,492,000 $14,700 - $4,930
182,590
kWh
$1,980
426
kW-months/year
$4,770
994
MMBtu
$480
45
gal
$35,130
2,492,000
lb
$14,700
-
$
TOTAL IMPLEMENTED Savings:
$2,250
Cost:
$4,885
$1,260 46,600 $510 109 - - $480 45 - - - - $1,260
46,600
kWh
$510
109
kW-months/year
-
-
MMBtu
$480
45
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes