IAC logo
IAC Assessment: OR0288
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0288
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1997
Principal Product liquid CO2, dry ice
NAICS n/a
SIC 2813 - Industrial Gases
Sales $1,000,000-$5,000,000
# of Employees 6
Plant Area (Sq.Ft.) 10,000
Annual Production 70,000 Tons
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,235 4,826,495 kWh $0.02
Electricity Demand $58,439 11,073 kW-months/year $5.28
Electricity Fees $363 - $ -
TOTAL ENERGY COSTS $169,167
RECOMMENDED SAVINGS* $544,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,930
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Primary Raw Material Primary Product
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$6,130
Cost:
$32,400
- - - - $130 1,320 $6,000 - - - -
-
kWh
-
-
kW-months/year
$130
1,320
gal
$6,000
-
$
-
-
$
02: 2.2615 CLEAN CONDENSER TUBES Savings:
$1,270
Cost:
$5,000
$1,270 57,444 - - - - - - - - $1,270
57,444
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$5,140
Cost:
-
$5,140 232,708 - - - - - - - - $5,140
232,708
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$529,800
Cost:
$65,000
$(-9,100) (-412,075) $(-9,100) (-1,637) - - - - $548,000 - $(-9,100)
(-412,075)
kWh
$(-9,100)
(-1,637)
kW-months/year
-
-
gal
-
-
$
$548,000
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$390
Cost:
$1,390
$282 12,896 $108 19 - - - - - - $282
12,896
kWh
$108
19
kW-months/year
-
-
gal
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,100
Cost:
$9,050
$1,500 68,288 $600 107 - - - - - - $1,500
68,288
kWh
$600
107
kW-months/year
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$544,830
Cost:
$112,840
$(-908) (-40,739) $(-8,392) (-1,511) $130 1,320 $6,000 - $548,000 - $(-908)
(-40,739)
kWh
$(-8,392)
(-1,511)
kW-months/year
$130
1,320
gal
$6,000
-
$
$548,000
-
$
TOTAL IMPLEMENTED Savings:
$12,930
Cost:
$38,790
$6,692 303,048 $108 19 $130 1,320 $6,000 - - - $6,692
303,048
kWh
$108
19
kW-months/year
$130
1,320
gal
$6,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Primary Raw Material Primary Product