IAC logo
IAC Assessment: OR0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1997
Principal Product Motor coaches
NAICS n/a
SIC 3711 - Motor Vehicles And Car Bodies
Sales $100,000,000-$500,000,000
# of Employees 534
Plant Area (Sq.Ft.) 435,600
Annual Production 500 Pieces
Production Hrs. Annual 2,125
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,184 2,925,264 kWh $0.05
Electricity Demand $36,819 8,916 kW-months/year $4.13
Electricity Fees $2,061 - $ -
Natural Gas $59,065 17,526 MMBtu $3.37
TOTAL ENERGY COSTS $341,409
RECOMMENDED SAVINGS* $129,980 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,380
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
01: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$89,400
Cost:
$15,300
- - - - - - - 53,200 $16,500 - $72,900 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
53,200
lb
$16,500
-
$
$72,900
-
$
02: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$24,200
Cost:
$139,000
- - - - $24,200 156,000 - - - - - - -
-
kWh
-
-
kW-months/year
$24,200
156,000
Tgal
-
-
lb
-
-
$
-
-
$
03: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$4,130
Cost:
$1,200
- - - - - - - - $4,130 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$4,130
-
$
-
-
$
04: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$8,400
Cost:
$4,900
- - - - - - - - - - $8,400 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$8,400
-
$
05: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$1,990
Cost:
-
- - - - - - $60 700 - - $1,930 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$60
700
lb
-
-
$
$1,930
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,860
Cost:
$2,500
$1,250 26,377 $610 148 - - - - - - - - $1,250
26,377
kWh
$610
148
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$129,980
Cost:
$162,900
$1,250 26,377 $610 148 $24,200 156,000 $60 53,900 $20,630 - $83,230 - $1,250
26,377
kWh
$610
148
kW-months/year
$24,200
156,000
Tgal
$60
53,900
lb
$20,630
-
$
$83,230
-
$
TOTAL IMPLEMENTED Savings:
$16,380
Cost:
$8,600
$1,250 26,377 $610 148 - - $60 700 $4,130 - $10,330 - $1,250
26,377
kWh
$610
148
kW-months/year
-
-
Tgal
$60
700
lb
$4,130
-
$
$10,330
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material