Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1997 |
Principal Product | Ink cartridge components |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 94,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 8,160 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $328,750 | 10,076,495 | kWh | $0.03 |
Electricity Demand | $43,110 | 188,472 | kW-months/year | $0.23 |
Electricity Fees | $3,437 | - | $ | - |
Natural Gas | $4,184 | 864 | MMBtu | $4.84 |
TOTAL ENERGY COSTS | $392,826 | |||
RECOMMENDED SAVINGS* | $126,800 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $96,726 Cost: $70,000 |
$(-910) | (-27,257) | $(-1,164) | (-374) | $98,800 | 52,500 | - | - | - | - |
$(-910) (-27,257) kWh |
$(-1,164) (-374) kW-months/year |
$98,800 52,500 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1162 USE LESS WASTEFUL PACKAGING |
Savings: $9,069 Cost: $150 |
- | - | - | - | - | 6,000 | - | - | $9,069 | - |
- - kWh |
- - kW-months/year |
- 6,000 lb |
- - $ |
$9,069 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $11,800 Cost: $8,090 |
$11,800 | 354,924 | - | - | - | - | - | - | - | - |
$11,800 354,924 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,514 Cost: $7,287 |
$3,812 | 114,009 | $702 | 226 | - | - | - | - | - | - |
$3,812 114,009 kWh |
$702 226 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $2,780 Cost: - |
$2,780 | 83,529 | - | - | - | - | - | - | - | - |
$2,780 83,529 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $478 Cost: - |
$478 | 15,240 | - | - | - | - | - | - | - | - |
$478 15,240 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $1,433 Cost: $2,240 |
$(-692) | (-20,809) | - | - | - | - | $840 | - | $1,285 | - |
$(-692) (-20,809) kWh |
- - kW-months/year |
- - lb |
$840 - $ |
$1,285 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $126,800 Cost: $87,767 |
$17,268 | 519,636 | $(-462) | (-148) | $98,800 | 58,500 | $840 | - | $10,354 | - | $17,268 519,636 kWh |
$(-462) (-148) kW-months/year |
$98,800 58,500 lb |
$840 - $ |
$10,354 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |