IAC logo
IAC Assessment: OR0308
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0308
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1997
Principal Product Processed eggs
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 61,425
Annual Production 16,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,606 2,008,499 kWh $0.02
Electricity Demand $13,774 67,896 kW-months/year $0.20
Electricity Fees $720 - $ -
Natural Gas $41,287 11,275 MMBtu $3.66
TOTAL ENERGY COSTS $129,387
RECOMMENDED SAVINGS* $76,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,650
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$62,300
Cost:
$79,000
- - - - $(-4,300) (-1,174) $30,000 1,676,480 $36,600 - -
-
kWh
-
-
kW-months/year
$(-4,300)
(-1,174)
MMBtu
$30,000
1,676,480
lb
$36,600
-
$
02: 3.4151 MINIMIZE WATER USAGE Savings:
$72
Cost:
-
$41 1,465 $31 6 - - - - - - $41
1,465
kWh
$31
6
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,430
Cost:
-
$3,430 123,095 - - - - - - - - $3,430
123,095
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,148
Cost:
$6,433
$2,140 76,788 $1,008 210 - - - - - - $2,140
76,788
kWh
$1,008
210
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.1224 REPLACE BOILER Savings:
$5,250
Cost:
$21,300
- - - - $5,250 1,433 - - - - -
-
kWh
-
-
kW-months/year
$5,250
1,433
MMBtu
-
-
lb
-
-
$
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$1,820
Cost:
$1,945
- - - - $1,820 497 - - - - -
-
kWh
-
-
kW-months/year
$1,820
497
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$76,020
Cost:
$108,678
$5,611 201,348 $1,039 216 $2,770 756 $30,000 1,676,480 $36,600 - $5,611
201,348
kWh
$1,039
216
kW-months/year
$2,770
756
MMBtu
$30,000
1,676,480
lb
$36,600
-
$
TOTAL IMPLEMENTED Savings:
$6,650
Cost:
$6,433
$5,611 201,348 $1,039 216 - - - - - - $5,611
201,348
kWh
$1,039
216
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production