Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1997 |
Principal Product | Rotational Molded Plastics |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 58 |
Plant Area (Sq.Ft.) | 45,000 |
Annual Production | 1,848,057 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $16,073 | 837,339 | kWh | $0.02 |
Electricity Demand | $6,638 | 21,864 | kW-months/year | $0.30 |
Electricity Fees | $1,770 | - | $ | - |
Natural Gas | $56,374 | 14,840 | MMBtu | $3.80 |
TOTAL ENERGY COSTS | $89,342 | |||
RECOMMENDED SAVINGS* | $30,896 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,334 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD |
Savings: $11,530 Cost: $1,830 |
- | - | - | - | - | - | $430 | 11,600 | $(-2,340) | - | $13,440 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$430 11,600 lb |
$(-2,340) - $ |
$13,440 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $9,625 Cost: $14,810 |
$(-340) | (-13,189) | $(-85) | (-22) | - | - | - | - | $10,050 | - | - | - |
$(-340) (-13,189) kWh |
$(-85) (-22) kW-months/year |
- - MMBtu |
- - lb |
$10,050 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,309 Cost: $2,320 |
- | - | - | - | $4,309 | 1,236 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,309 1,236 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,930 Cost: $8,750 |
$665 | 34,584 | $2,265 | 581 | - | - | - | - | - | - | - | - |
$665 34,584 kWh |
$2,265 581 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,635 Cost: $2,500 |
$852 | 39,859 | $783 | 200 | - | - | - | - | - | - | - | - |
$852 39,859 kWh |
$783 200 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $169 Cost: $670 |
$80 | 4,103 | $89 | 23 | - | - | - | - | - | - | - | - |
$80 4,103 kWh |
$89 23 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $698 Cost: $2,017 |
$473 | 24,619 | $225 | 58 | - | - | - | - | - | - | - | - |
$473 24,619 kWh |
$225 58 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,896 Cost: $32,897 |
$1,730 | 89,976 | $3,277 | 840 | $4,309 | 1,236 | $430 | 11,600 | $7,710 | - | $13,440 | - | $1,730 89,976 kWh |
$3,277 840 kW-months/year |
$4,309 1,236 MMBtu |
$430 11,600 lb |
$7,710 - $ |
$13,440 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,334 Cost: $5,000 |
$932 | 43,962 | $872 | 223 | - | - | $430 | 11,600 | $(-2,340) | - | $13,440 | - | $932 43,962 kWh |
$872 223 kW-months/year |
- - MMBtu |
$430 11,600 lb |
$(-2,340) - $ |
$13,440 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |