IAC logo
IAC Assessment: OR0313
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0313
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Detectors
NAICS n/a
SIC 3669 - Communications Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 430
Plant Area (Sq.Ft.) 0
Annual Production 410,000 Pieces
Production Hrs. Annual 5,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,107 3,218,933 kWh $0.04
Electricity Demand $37,560 93,900 kW-months/year $0.40
Electricity Fees $254 - $ -
Natural Gas $4,604 1,001 MMBtu $4.60
TOTAL ENERGY COSTS $211,332
RECOMMENDED SAVINGS* $137,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,515
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$59,850
Cost:
$437
- - - - $63,350 1,475 - - - - $(-3,500) - - - -
-
kWh
-
-
kW-months/year
$63,350
1,475
lb
-
-
$
-
-
$
$(-3,500)
-
$
-
-
$
02: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$53,400
Cost:
$18,750
- - - - - - $57,000 - - - - - $(-3,600) - -
-
kWh
-
-
kW-months/year
-
-
lb
$57,000
-
$
-
-
$
-
-
$
$(-3,600)
-
$
03: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$627
Cost:
-
- - - - - - - - $627 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$627
-
$
-
-
$
-
-
$
04: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$6,605
Cost:
-
- - - - - - $4,025 - - - $2,580 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,025
-
$
-
-
$
$2,580
-
$
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,486
Cost:
$1,210
$6,483 183,763 $1,003 209 - - - - - - - - - - $6,483
183,763
kWh
$1,003
209
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,060
Cost:
$2,670
$4,624 131,008 $1,512 314 - - $222 - - - - - $2,702 - $4,624
131,008
kWh
$1,512
314
kW-months/year
-
-
lb
$222
-
$
-
-
$
-
-
$
$2,702
-
$
TOTAL RECOMMENDED Savings:
$137,028
Cost:
$23,067
$11,107 314,771 $2,515 523 $63,350 1,475 $61,247 - $627 - $(-920) - $(-898) - $11,107
314,771
kWh
$2,515
523
kW-months/year
$63,350
1,475
lb
$61,247
-
$
$627
-
$
$(-920)
-
$
$(-898)
-
$
TOTAL IMPLEMENTED Savings:
$75,515
Cost:
$3,107
$4,624 131,008 $1,512 314 $63,350 1,475 $4,247 - - - $(-920) - $2,702 - $4,624
131,008
kWh
$1,512
314
kW-months/year
$63,350
1,475
lb
$4,247
-
$
-
-
$
$(-920)
-
$
$2,702
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost