Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1998 |
Principal Product | Detectors |
NAICS | n/a |
SIC | 3669 - Communications Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 430 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 410,000 Pieces |
Production Hrs. Annual | 5,000 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $115,107 | 3,218,933 | kWh | $0.04 |
Electricity Demand | $37,560 | 93,900 | kW-months/year | $0.40 |
Electricity Fees | $254 | - | $ | - |
Natural Gas | $4,604 | 1,001 | MMBtu | $4.60 |
TOTAL ENERGY COSTS | $211,332 | |||
RECOMMENDED SAVINGS* | $137,028 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,515 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $59,850 Cost: $437 |
- | - | - | - | $63,350 | 1,475 | - | - | - | - | $(-3,500) | - | - | - |
- - kWh |
- - kW-months/year |
$63,350 1,475 lb |
- - $ |
- - $ |
$(-3,500) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $53,400 Cost: $18,750 |
- | - | - | - | - | - | $57,000 | - | - | - | - | - | $(-3,600) | - |
- - kWh |
- - kW-months/year |
- - lb |
$57,000 - $ |
- - $ |
- - $ |
$(-3,600) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $627 Cost: - |
- | - | - | - | - | - | - | - | $627 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$627 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $6,605 Cost: - |
- | - | - | - | - | - | $4,025 | - | - | - | $2,580 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$4,025 - $ |
- - $ |
$2,580 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $7,486 Cost: $1,210 |
$6,483 | 183,763 | $1,003 | 209 | - | - | - | - | - | - | - | - | - | - |
$6,483 183,763 kWh |
$1,003 209 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $9,060 Cost: $2,670 |
$4,624 | 131,008 | $1,512 | 314 | - | - | $222 | - | - | - | - | - | $2,702 | - |
$4,624 131,008 kWh |
$1,512 314 kW-months/year |
- - lb |
$222 - $ |
- - $ |
- - $ |
$2,702 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $137,028 Cost: $23,067 |
$11,107 | 314,771 | $2,515 | 523 | $63,350 | 1,475 | $61,247 | - | $627 | - | $(-920) | - | $(-898) | - | $11,107 314,771 kWh |
$2,515 523 kW-months/year |
$63,350 1,475 lb |
$61,247 - $ |
$627 - $ |
$(-920) - $ |
$(-898) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,515 Cost: $3,107 |
$4,624 | 131,008 | $1,512 | 314 | $63,350 | 1,475 | $4,247 | - | - | - | $(-920) | - | $2,702 | - | $4,624 131,008 kWh |
$1,512 314 kW-months/year |
$63,350 1,475 lb |
$4,247 - $ |
- - $ |
$(-920) - $ |
$2,702 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Ancillary Material Cost |