IAC logo
IAC Assessment: OR0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Printed Advertisments
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $50,000,000-$100,000,000
# of Employees 285
Plant Area (Sq.Ft.) 93,750
Annual Production 96,443,807 Pounds
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $347,618 10,065,065 kWh $0.03
Electricity Demand $56,742 18,040 kW-months/year $3.15
Electricity Fees $15,159 - $ -
Natural Gas $225,034 63,919 MMBtu $3.52
TOTAL ENERGY COSTS $1,968,394
RECOMMENDED SAVINGS* $286,876 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$124,110
Cost:
$23,900
- - - - - - - - $124,110 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$124,110
-
$
02: 3.2176 INCREASE USE OF AUTOMATION Savings:
$71,400
Cost:
$9,970
- - - - - - - - $71,400 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$71,400
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$36,150
Cost:
$26,600
- - - - - - $36,150 11,182 - - -
-
kWh
-
-
kW-months/year
-
-
$
$36,150
11,182
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,835
Cost:
$23,520
$8,649 264,068 $1,186 362 - - - - - - $8,649
264,068
kWh
$1,186
362
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$38,890
Cost:
$53,900
$34,330 1,048,359 $4,560 1,396 - - - - - - $34,330
1,048,359
kWh
$4,560
1,396
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,487
Cost:
$31,200
- - - - $5,487 - - - - - -
-
kWh
-
-
kW-months/year
$5,487
-
$
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,004
Cost:
$4,350
$804 24,619 $200 61 - - - - - - $804
24,619
kWh
$200
61
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$286,876
Cost:
$173,440
$43,783 1,337,046 $5,946 1,819 $5,487 - $36,150 11,182 $195,510 - $43,783
1,337,046
kWh
$5,946
1,819
kW-months/year
$5,487
-
$
$36,150
11,182
MMBtu
$195,510
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product