IAC logo
IAC Assessment: OR0319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Metal roofing materials
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 17
Plant Area (Sq.Ft.) 0
Annual Production 113,569,368 Pounds
Production Hrs. Annual 2,600
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,814 244,725 kWh $0.06
Electricity Demand $2,104 984 kW-months/year $2.14
Natural Gas $701 123 MMBtu $5.70
LPG $9,000 638 MMBtu $14.11
TOTAL ENERGY COSTS $39,062
RECOMMENDED SAVINGS* $265,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $265,417
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $ $ $
01: 4.452 ELIMINATE SHIFT Savings:
$200,000
Cost:
$2,500
- (-146,542) - - - 114,000 - - - - - - - - $200,000 - -
(-146,542)
kWh
-
-
kW-months/year
-
114,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
$200,000
-
$
02: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$32,660
Cost:
$300,000
$750 12,309 - - - - - - $(-7,500) - - - - - $39,410 - $750
12,309
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$(-7,500)
-
$
-
-
$
-
-
$
$39,410
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$31,569
Cost:
$931
- - - - $(-32,500) 143,000 $(-83) - - - $65,000 - $(-848) - - - -
-
kWh
-
-
kW-months/year
$(-32,500)
143,000
lb
$(-83)
-
$
-
-
$
$65,000
-
$
$(-848)
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$833
Cost:
$1,000
$590 9,672 $243 46 - - - - - - - - - - - - $590
9,672
kWh
$243
46
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$355
Cost:
$1,750
$271 5,569 $84 16 - - - - - - - - - - - - $271
5,569
kWh
$84
16
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$265,417
Cost:
$306,181
$1,611 (-118,992) $327 62 $(-32,500) 257,000 $(-83) - $(-7,500) - $65,000 - $(-848) - $239,410 - $1,611
(-118,992)
kWh
$327
62
kW-months/year
$(-32,500)
257,000
lb
$(-83)
-
$
$(-7,500)
-
$
$65,000
-
$
$(-848)
-
$
$239,410
-
$
TOTAL IMPLEMENTED Savings:
$265,417
Cost:
$306,181
$1,611 (-118,992) $327 62 $(-32,500) 257,000 $(-83) - $(-7,500) - $65,000 - $(-848) - $239,410 - $1,611
(-118,992)
kWh
$327
62
kW-months/year
$(-32,500)
257,000
lb
$(-83)
-
$
$(-7,500)
-
$
$65,000
-
$
$(-848)
-
$
$239,410
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product