IAC logo
IAC Assessment: OR0323
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0323
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Investment Castings
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 203,696
Annual Production 3,172,304 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $545,564 31,300,704 kWh $0.02
Electricity Demand $376,763 661,956 kW-months/year $0.57
Electricity Fees $9,453 - $ -
Natural Gas $476,523 144,972 MMBtu $3.29
TOTAL ENERGY COSTS $1,967,703
RECOMMENDED SAVINGS* $246,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $194,253
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ Tgal $ lb $ lb $ $ $ $ $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,329
Cost:
$15,000
$12,006 688,159 $8,323 1,218 - - - - - - - - - - - - - - - - $12,006
688,159
kWh
$8,323
1,218
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$33,509
Cost:
$5,600
$19,764 1,133,060 $13,745 2,012 - - - - - - - - - - - - - - - - $19,764
1,133,060
kWh
$13,745
2,012
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$16,330
Cost:
$15,000
- - - - - - $8,935 70,200 $6,695 183,400 - - - - - - - - $700 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$8,935
70,200
lb
$6,695
183,400
lb
-
-
$
-
-
$
-
-
$
-
-
$
$700
-
$
04: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$3,712
Cost:
$2,800
$3,712 213,072 - - - - - - - - - - - - - - - - - - $3,712
213,072
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
-
Cost:
$57,200
- - - - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$48,539
Cost:
$3,154
$(-600) (-31,360) $(-98) (-14) $49,237 12,614,400 - - - - - - - - - - - - - - $(-600)
(-31,360)
kWh
$(-98)
(-14)
kW-months/year
$49,237
12,614,400
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
07: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$89,264
Cost:
$5,400
- - - - - - - - - - $(-1,536) - - - $82,800 - $8,000 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
$(-1,536)
-
$
-
-
$
$82,800
-
$
$8,000
-
$
-
-
$
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$3,267
Cost:
$5,409
$1,847 106,096 $1,420 208 - - - - - - - - - - - - - - - - $1,847
106,096
kWh
$1,420
208
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,032
Cost:
$980
$3,647 209,261 $385 56 - - - - - - - - - - - - - - - - $3,647
209,261
kWh
$385
56
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
10: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$27,522
Cost:
$71,000
- - - - - - - - - - - - $27,522 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
$27,522
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$246,504
Cost:
$181,543
$40,376 2,318,288 $23,775 3,480 $49,237 12,614,400 $8,935 70,200 $6,695 183,400 $(-1,536) - $27,522 - $82,800 - $8,000 - $700 - $40,376
2,318,288
kWh
$23,775
3,480
kW-months/year
$49,237
12,614,400
Tgal
$8,935
70,200
lb
$6,695
183,400
lb
$(-1,536)
-
$
$27,522
-
$
$82,800
-
$
$8,000
-
$
$700
-
$
TOTAL IMPLEMENTED Savings:
$194,253
Cost:
$118,389
$37,264 2,136,576 $23,873 3,494 - - $8,935 70,200 $6,695 183,400 $(-1,536) - $27,522 - $82,800 - $8,000 - $700 - $37,264
2,136,576
kWh
$23,873
3,494
kW-months/year
-
-
Tgal
$8,935
70,200
lb
$6,695
183,400
lb
$(-1,536)
-
$
$27,522
-
$
$82,800
-
$
$8,000
-
$
$700
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ lb $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost By-product Production