IAC logo
IAC Assessment: OR0327
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0327
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Cookies
NAICS n/a
SIC 2052 - Cookies And Crackers
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 110,000
Annual Production 25,289,628 Pounds
Production Hrs. Annual 7,514
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,992 3,906,800 kWh $0.03
Electricity Demand $31,532 86,784 kW-months/year $0.36
Electricity Fees $1,780 - $ -
Natural Gas $179,665 44,915 MMBtu $4.00
TOTAL ENERGY COSTS $701,649
RECOMMENDED SAVINGS* $233,193 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $195,044
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ lb $ $ $ $ $ $ $ $ $ $
01: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$176,000
Cost:
$200,000
- - - - - - $176,000 624,000 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$176,000
624,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 4.1260 INSTALL SENSORS TO DETECT DEFECTS Savings:
$20,040
Cost:
$2,745
- - - - - - - - $1,725 - - - - - - - $18,315 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$1,725
-
$
-
-
$
-
-
$
-
-
$
$18,315
-
$
03: 4.6310 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$13,651
Cost:
$22,265
- - - - - - - - - - - - - - - - $13,651 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
$13,651
-
$
04: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$12,158
Cost:
$28,400
$(-201) (-5,862) $(-41) (-9) - - - - $12,400 - - - - - - - - - $(-201)
(-5,862)
kWh
$(-41)
(-9)
kW-months/year
-
-
$
-
-
lb
$12,400
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 3.1194 USE AUTOMATIC FLOW CONTROL Savings:
$1,896
Cost:
$1,300
- - - - - - - 2,133 - - - - $1,896 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
2,133
lb
-
-
$
-
-
$
$1,896
-
$
-
-
$
-
-
$
06: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$986
Cost:
-
- - - - - - - - - - $986 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$986
-
$
-
-
$
-
-
$
-
-
$
07: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$577
Cost:
$411
- - - - - - - - $577 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$577
-
$
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,460
Cost:
$500
$1,051 30,774 - - - - - - $194 - - - - - $215 - - - $1,051
30,774
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$194
-
$
-
-
$
-
-
$
$215
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,863
Cost:
-
$3,205 94,080 $658 151 - - - - - - - - - - - - - - $3,205
94,080
kWh
$658
151
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,680
Cost:
$11,200
- - - - $1,680 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,680
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$882
Cost:
$1,210
$735 21,688 $147 35 - - - - - - - - - - - - - - $735
21,688
kWh
$147
35
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$233,193
Cost:
$268,031
$4,790 140,680 $764 177 $1,680 - $176,000 626,133 $14,896 - $986 - $1,896 - $215 - $31,966 - $4,790
140,680
kWh
$764
177
kW-months/year
$1,680
-
$
$176,000
626,133
lb
$14,896
-
$
$986
-
$
$1,896
-
$
$215
-
$
$31,966
-
$
TOTAL IMPLEMENTED Savings:
$195,044
Cost:
$229,311
$4,055 118,992 $617 142 - - $176,000 624,000 $13,171 - $986 - - - $215 - - - $4,055
118,992
kWh
$617
142
kW-months/year
-
-
$
$176,000
624,000
lb
$13,171
-
$
$986
-
$
-
-
$
$215
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product