IAC logo
IAC Assessment: OR0331
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0331
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Steel Replacement Parts
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 4,000,000
Annual Production 33,911 Tons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,167,072 35,057,445 kWh $0.03
Electricity Demand $433,640 130,395 kW-months/year $3.33
Electricity Fees $35,153 - $ -
Natural Gas $582,002 189,766 MMBtu $3.07
LPG $30,763 4,114 MMBtu $7.48
TOTAL ENERGY COSTS $2,278,989
RECOMMENDED SAVINGS* $1,473,032 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,379,181
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,374,400
Cost:
$105,000
$(-18,600) (-558,910) $(-3,000) (-895) - - - - - - $1,396,000 - $(-18,600)
(-558,910)
kWh
$(-3,000)
(-895)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$1,396,000
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,781
Cost:
$1,000
$4,267 128,077 $514 154 - - - - - - - - $4,267
128,077
kWh
$514
154
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$78,861
Cost:
$26,602
- - - - $78,861 31,582 - - - - - - -
-
kWh
-
-
kW-months/year
$78,861
31,582
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$14,990
Cost:
$79,750
$(-560) (-16,706) - - $(-10,270) (-4,114) $30,760 4,114 $(-4,940) - - - $(-560)
(-16,706)
kWh
-
-
kW-months/year
$(-10,270)
(-4,114)
MMBtu
$30,760
4,114
MMBtu
$(-4,940)
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
-
Cost:
$136,000
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,473,032
Cost:
$348,352
$(-14,893) (-447,539) $(-2,486) (-741) $68,591 27,468 $30,760 4,114 $(-4,940) - $1,396,000 - $(-14,893)
(-447,539)
kWh
$(-2,486)
(-741)
kW-months/year
$68,591
27,468
MMBtu
$30,760
4,114
MMBtu
$(-4,940)
-
$
$1,396,000
-
$
TOTAL IMPLEMENTED Savings:
$1,379,181
Cost:
$106,000
$(-14,333) (-430,833) $(-2,486) (-741) - - - - - - $1,396,000 - $(-14,333)
(-430,833)
kWh
$(-2,486)
(-741)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$1,396,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Primary Product