IAC Assessment: OR0345
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0345
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Paper Rolls
NAICS n/a
SIC 2655 - Fiber Cans, Drums & Similar Products
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 50,000
Annual Production 52,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,484 1,572,978 kWh $0.02
Electricity Demand $9,248 42,684 kW-months/year $0.22
Electricity Fees $2,287 - $ -
Natural Gas $11,822 2,457 MMBtu $4.81
LPG $12,223 986 MMBtu $12.40
TOTAL ENERGY COSTS $94,854
RECOMMENDED SAVINGS* $37,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $446
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $
01: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$22,460
Cost:
$13,140
$(-170) (-2,052) $(-120) (-540) - - - - - - $22,750 - - - $(-170)
(-2,052)
kWh
$(-120)
(-540)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$22,750
-
$
-
-
$
02: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$6,490
Cost:
$44,000
$(-30) (-1,172) - - $(-4,520) (-986) $12,220 985 - - $(-1,180) - - - $(-30)
(-1,172)
kWh
-
-
kW-months/year
$(-4,520)
(-986)
MMBtu
$12,220
985
MMBtu
-
-
lb
$(-1,180)
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,284
Cost:
$65
$2,336 100,821 - - - - - - - - $75 - $1,873 - $2,336
100,821
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$75
-
$
$1,873
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$446
Cost:
$1,000
$387 16,706 $59 23 - - - - - - - - - - $387
16,706
kWh
$59
23
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$2,590
Cost:
-
- - - - - - - - $2,590 41,700 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$2,590
41,700
lb
-
-
$
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,560
Cost:
$9,635
$(-197) (-1,465) $(-163) (-756) - - - - $3,230 52,000 $(-1,310) - - - $(-197)
(-1,465)
kWh
$(-163)
(-756)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$3,230
52,000
lb
$(-1,310)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$37,830
Cost:
$67,840
$2,326 112,838 $(-224) (-1,273) $(-4,520) (-986) $12,220 985 $5,820 93,700 $20,335 - $1,873 - $2,326
112,838
kWh
$(-224)
(-1,273)
kW-months/year
$(-4,520)
(-986)
MMBtu
$12,220
985
MMBtu
$5,820
93,700
lb
$20,335
-
$
$1,873
-
$
TOTAL IMPLEMENTED Savings:
$446
Cost:
$1,000
$387 16,706 $59 23 - - - - - - - - - - $387
16,706
kWh
$59
23
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost