IAC Assessment: OR0361
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Low Density Fiber Board
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 310,000
Annual Production 160,000 Thousand Feet
Production Hrs. Annual 7,200
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,236,281 36,371,923 kWh $0.03
Electricity Demand $279,874 1,008,552 kW-months/year $0.28
Electricity Fees $5,280 - $ -
Natural Gas $1,205,452 492,021 MMBtu $2.45
LPG $7,759 1,823 MMBtu $4.26
TOTAL ENERGY COSTS $2,787,446
RECOMMENDED SAVINGS* $207,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$24,471
Cost:
$1,200
- - - - $24,471 9,965 - - - - - - -
-
kWh
-
-
kW-months/year
$24,471
9,965
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,408
Cost:
$13,918
$4,553 133,939 $743 223 - - - - $5,048 - $2,064 - $4,553
133,939
kWh
$743
223
kW-months/year
-
-
MMBtu
-
-
lb
$5,048
-
$
$2,064
-
$
03: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS Savings:
$3,020
Cost:
$190
- - - - $3,020 1,233 - - - - - - -
-
kWh
-
-
kW-months/year
$3,020
1,233
MMBtu
-
-
lb
-
-
$
-
-
$
04: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$166,000
Cost:
$63,000
- - - - - - - - $166,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$166,000
-
$
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,824
Cost:
-
- - - - - - $1,824 54,720 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,824
54,720
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$207,723
Cost:
$78,308
$4,553 133,939 $743 223 $27,491 11,198 $1,824 54,720 $171,048 - $2,064 - $4,553
133,939
kWh
$743
223
kW-months/year
$27,491
11,198
MMBtu
$1,824
54,720
lb
$171,048
-
$
$2,064
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost