IAC logo
IAC Assessment: OR0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Particle Board
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $50,000,000-$100,000,000
# of Employees 190
Plant Area (Sq.Ft.) 250,000
Annual Production 190,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,575,699 66,403,577 kWh $0.04
Electricity Demand $452,914 1,278,816 kW-months/year $0.35
Electricity Fees $300 - $ -
Natural Gas $834,866 265,323 MMBtu $3.15
LPG $26,361 3,835 MMBtu $6.87
TOTAL ENERGY COSTS $3,890,140
RECOMMENDED SAVINGS* $1,343,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $538,280
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 4.1260 INSTALL SENSORS TO DETECT DEFECTS Savings:
$201,600
Cost:
$113,500
- - - - - - - - $201,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$201,600
-
$
-
-
$
02: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$337,500
Cost:
$66,400
- - - - - - - - $337,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$337,500
-
$
-
-
$
03: 4.1250 Savings:
$12,680
Cost:
$7,950
- - - - - - - - $(-16,800) - $29,480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-16,800)
-
$
$29,480
-
$
04: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$324,000
Cost:
$4,700
- - - - - - - - - - $324,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$324,000
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$45,360
Cost:
$89,325
$38,490 992,087 $6,870 1,616 - - - - - - - - $38,490
992,087
kWh
$6,870
1,616
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$13,220
Cost:
$94,000
$(-700) (-17,878) $(-360) (-84) $(-12,080) (-3,839) $26,360 3,835 - - - - $(-700)
(-17,878)
kWh
$(-360)
(-84)
kW-months/year
$(-12,080)
(-3,839)
MMBtu
$26,360
3,835
MMBtu
-
-
$
-
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$409,580
Cost:
$6,890,000
$2,133,310 54,998,242 $322,000 82,680 $(-1,221,000) (-387,875) - - $(-824,730) - - - $2,133,310
54,998,242
kWh
$322,000
82,680
kW-months/year
$(-1,221,000)
(-387,875)
MMBtu
-
-
MMBtu
$(-824,730)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,343,940
Cost:
$7,265,875
$2,171,100 55,972,451 $328,510 84,212 $(-1,233,080) (-391,714) $26,360 3,835 $(-302,430) - $353,480 - $2,171,100
55,972,451
kWh
$328,510
84,212
kW-months/year
$(-1,233,080)
(-391,714)
MMBtu
$26,360
3,835
MMBtu
$(-302,430)
-
$
$353,480
-
$
TOTAL IMPLEMENTED Savings:
$538,280
Cost:
$126,150
- - - - - - - - $184,800 - $353,480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$184,800
-
$
$353,480
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Primary Product