IAC logo
IAC Assessment: OR0367
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0367
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Thermoformed Plastics
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 64
Plant Area (Sq.Ft.) 60,000
Annual Production 650,000 Pounds
Production Hrs. Annual 6,120
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,479 1,973,036 kWh $0.05
Electricity Demand $12,253 66,396 kW-months/year $0.18
Natural Gas $6,136 1,410 MMBtu $4.35
TOTAL ENERGY COSTS $173,868
RECOMMENDED SAVINGS* $143,327 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,847
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$430
Cost:
$1,360
$430 8,792 - 35 - - - - $430
8,792
kWh
-
35
kW-months/year
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,980
Cost:
$26,760
$9,460 235,053 $1,520 690 - - - - $9,460
235,053
kWh
$1,520
690
kW-months/year
-
-
lb
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,417
Cost:
$565
$1,417 34,291 - - - - - - $1,417
34,291
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$63,000
Cost:
$13,080
- - - - $63,000 15,000 - - -
-
kWh
-
-
kW-months/year
$63,000
15,000
lb
-
-
$
05: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$67,500
Cost:
$21,680
- - - - - - $67,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$67,500
-
$
TOTAL RECOMMENDED Savings:
$143,327
Cost:
$63,445
$11,307 278,136 $1,520 725 $63,000 15,000 $67,500 - $11,307
278,136
kWh
$1,520
725
kW-months/year
$63,000
15,000
lb
$67,500
-
$
TOTAL IMPLEMENTED Savings:
$64,847
Cost:
$15,005
$1,847 43,083 - 35 $63,000 15,000 - - $1,847
43,083
kWh
-
35
kW-months/year
$63,000
15,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes