IAC Assessment: OR0370
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0370
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Manufactured Homes
NAICS n/a
SIC 2451 - Mobile Homes
Sales $10,000,000-$50,000,000
# of Employees 208
Plant Area (Sq.Ft.) 0
Annual Production 1,664 Pieces
Production Hrs. Annual 0
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,773 1,848,769 kWh $0.04
Electricity Demand $21,510 66,732 kW-months/year $0.32
Electricity Fees $252 - $ -
Natural Gas $75,096 12,137 MMBtu $6.19
TOTAL ENERGY COSTS $343,709
RECOMMENDED SAVINGS* $135,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $131,301
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$27,300
Cost:
-
- - - - $27,300 4,420 - - - - - - -
-
kWh
-
-
kW-months/year
$27,300
4,420
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$4,900
Cost:
$650
- - - - $4,900 785 - - - - - - -
-
kWh
-
-
kW-months/year
$4,900
785
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,673
Cost:
$2,050
$2,642 74,736 $1,031 215 - - - - - - - - $2,642
74,736
kWh
$1,031
215
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,748
Cost:
$1,909
- - - - $2,748 444 - - - - - - -
-
kWh
-
-
kW-months/year
$2,748
444
MMBtu
-
-
lb
-
-
$
-
-
$
05: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$92,680
Cost:
-
- - - - - - $17,000 10,000 - - $75,680 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,000
10,000
lb
-
-
$
$75,680
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,089
Cost:
$12,821
$2,155 60,961 $1,596 336 - - - - $31 - $307 - $2,155
60,961
kWh
$1,596
336
kW-months/year
-
-
MMBtu
-
-
lb
$31
-
$
$307
-
$
TOTAL RECOMMENDED Savings:
$135,390
Cost:
$17,430
$4,797 135,697 $2,627 551 $34,948 5,649 $17,000 10,000 $31 - $75,987 - $4,797
135,697
kWh
$2,627
551
kW-months/year
$34,948
5,649
MMBtu
$17,000
10,000
lb
$31
-
$
$75,987
-
$
TOTAL IMPLEMENTED Savings:
$131,301
Cost:
$4,609
$2,642 74,736 $1,031 215 $34,948 5,649 $17,000 10,000 - - $75,680 - $2,642
74,736
kWh
$1,031
215
kW-months/year
$34,948
5,649
MMBtu
$17,000
10,000
lb
-
-
$
$75,680
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material