IAC logo
IAC Assessment: OR0373
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0373
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Amino Acids
NAICS n/a
SIC 2833 - Medicinals And Botanicals
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 65,340
Annual Production 0 Pounds
Production Hrs. Annual 1,560
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $9,509 267,000 kWh $0.04
Electricity Demand $950 300 kW-months/year $3.17
Electricity Fees $950 - $ -
TOTAL ENERGY COSTS $11,409
RECOMMENDED SAVINGS* $264,696 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,477
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ gal $ $ $ $ $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,100
Cost:
-
- - - - - - - - - - - - $9,100 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
$
-
-
$
$9,100
-
$
-
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$262
Cost:
-
$181 5,275 - - - - - - $25 - - - - - $56 - $181
5,275
kWh
-
-
kW-months/year
-
-
$
-
-
gal
$25
-
$
-
-
$
-
-
$
$56
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,186
Cost:
$630
$2,186 63,600 - - - - - - - - - - - - - - $2,186
63,600
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,115
Cost:
$11,205
$5,165 150,350 $950 294 - - - - - - - - - - - - $5,165
150,350
kWh
$950
294
kW-months/year
-
-
$
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,083
Cost:
$6,300
$2,083 50,700 - - - - - - - - - - - - - - $2,083
50,700
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$950
Cost:
$2,700
- - - - $950 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$950
-
$
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$244,000
Cost:
$110,000
- - - - - - $39,310 38,162 - - $(-22,900) - - - $227,590 - -
-
kWh
-
-
kW-months/year
-
-
$
$39,310
38,162
gal
-
-
$
$(-22,900)
-
$
-
-
$
$227,590
-
$
TOTAL RECOMMENDED Savings:
$264,696
Cost:
$130,835
$9,615 269,925 $950 294 $950 - $39,310 38,162 $25 - $(-22,900) - $9,100 - $227,646 - $9,615
269,925
kWh
$950
294
kW-months/year
$950
-
$
$39,310
38,162
gal
$25
-
$
$(-22,900)
-
$
$9,100
-
$
$227,646
-
$
TOTAL IMPLEMENTED Savings:
$15,477
Cost:
$11,205
$5,346 155,625 $950 294 - - - - $25 - - - $9,100 - $56 - $5,346
155,625
kWh
$950
294
kW-months/year
-
-
$
-
-
gal
$25
-
$
-
-
$
$9,100
-
$
$56
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost