Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2000 |
Principal Product | Dehydrated Potato Flakes |
NAICS | n/a |
SIC | 2034 - Dehydrated Fruits, Vegetables, Soups |
Sales | $10,000,000-$50,000,000 |
# of Employees | 77 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 38,435,809 Pounds |
Production Hrs. Annual | 37,680 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $230,664 | 8,427,022 | kWh | $0.03 |
Electricity Demand | $63,894 | 214,956 | kW-months/year | $0.30 |
Electricity Fees | $9,519 | - | $ | - |
Natural Gas | $1,014,525 | 385,209 | MMBtu | $2.63 |
TOTAL ENERGY COSTS | $1,782,058 | |||
RECOMMENDED SAVINGS* | $1,555,267 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $108,000 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,486 Cost: - |
$2,937 | 109,906 | $549 | 172 | - | - | - | - | - | - | - | - | - | - |
$2,937 109,906 kWh |
$549 172 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $1,345,966 Cost: $600,000 |
- | - | - | - | $(-229,234) | (-56,531) | - | - | $(-290,400) | - | - | - | $1,865,600 | - |
- - kWh |
- - kW-months/year |
$(-229,234) (-56,531) MMBtu |
- - Tgal |
$(-290,400) - $ |
- - Tgal |
$1,865,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $97,815 Cost: $113,670 |
$(-19,709) | (-737,397) | $(-3,686) | 1,152 | - | - | $86,200 | 134,656,000 | - | - | $35,010 | - | - | - |
$(-19,709) (-737,397) kWh |
$(-3,686) 1,152 kW-months/year |
- - MMBtu |
$86,200 134,656,000 Tgal |
- - $ |
$35,010 - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS |
Savings: $108,000 Cost: $40,000 |
- | - | - | - | - | - | $108,000 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$108,000 - Tgal |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,555,267 Cost: $753,670 |
$(-16,772) | (-627,491) | $(-3,137) | 1,324 | $(-229,234) | (-56,531) | $194,200 | 134,656,000 | $(-290,400) | - | $35,010 | - | $1,865,600 | - | $(-16,772) (-627,491) kWh |
$(-3,137) 1,324 kW-months/year |
$(-229,234) (-56,531) MMBtu |
$194,200 134,656,000 Tgal |
$(-290,400) - $ |
$35,010 - Tgal |
$1,865,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $108,000 Cost: $40,000 |
- | - | - | - | - | - | $108,000 | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
$108,000 - Tgal |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | By-product Production |