IAC logo
IAC Assessment: OR0379
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0379
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Softwood Veneer
NAICS n/a
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 50,000
Annual Production 1,280,000,000 Thousand Feet
Production Hrs. Annual 4,680
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $302,762 6,799,238 kWh $0.04
Natural Gas $315,161 77,419 MMBtu $4.07
TOTAL ENERGY COSTS $617,923
RECOMMENDED SAVINGS* $1,065,886 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,383
Cost:
$7,000
$4,286 125,440 $1,097 322 - - - - - - $4,286
125,440
kWh
$1,097
322
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$9,673
Cost:
$15,010
$7,758 227,140 $1,915 562 - - - - - - $7,758
227,140
kWh
$1,915
562
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,146
Cost:
-
$900 26,377 $246 72 - - - - - - $900
26,377
kWh
$246
72
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$3,099
Cost:
$885
$2,897 84,701 $202 178 - - - - - - $2,897
84,701
kWh
$202
178
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,229
Cost:
-
$1,729 50,703 - - - - $42 - $458 - $1,729
50,703
kWh
-
-
kW-months/year
-
-
$
$42
-
$
$458
-
$
06: 2.8112 COMBINE UTILITY METERS Savings:
$1,715
Cost:
$4,000
- - $494 - $1,221 - - - - - -
-
kWh
$494
-
kW-months/year
$1,221
-
$
-
-
$
-
-
$
07: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$9,628
Cost:
$48,484
$7,525 220,397 $2,103 617 - - - - - - $7,525
220,397
kWh
$2,103
617
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,013
Cost:
$19,600
- - - - $7,013 - - - - - -
-
kWh
-
-
kW-months/year
$7,013
-
$
-
-
$
-
-
$
09: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$1,026,000
Cost:
$1,337,500
- - - - - - - - $1,026,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$1,026,000
-
$
TOTAL RECOMMENDED Savings:
$1,065,886
Cost:
$1,432,479
$25,095 734,758 $6,057 1,751 $8,234 - $42 - $1,026,458 - $25,095
734,758
kWh
$6,057
1,751
kW-months/year
$8,234
-
$
$42
-
$
$1,026,458
-
$
TOTAL IMPLEMENTED Savings:
$18,110
Cost:
$56,369
$14,708 430,538 $3,402 1,117 - - - - - - $14,708
430,538
kWh
$3,402
1,117
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Raw Material