IAC logo
IAC Assessment: OR0383
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0383
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Particle Board
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 200,000
Annual Production 37,204 Thousand Feet
Production Hrs. Annual 8,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $460,680 10,382,181 kWh $0.04
Electricity Demand $106,329 232,500 kW-months/year $0.46
Electricity Fees $4,618 - $ -
Wood $778,448 304,290 MMBtu $2.56
TOTAL ENERGY COSTS $1,350,075
RECOMMENDED SAVINGS* $365,662 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $240,080
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Personnel Changes Electricity Usage Electricity Demand Electricity Fees Wood Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$121,300
Cost:
$252,800
$(-5,440) (-122,802) $(-960) (-175) - - - - $127,700 - $(-5,440)
(-122,802)
kWh
$(-960)
(-175)
kW-months/year
-
-
$
-
-
MMBtu
$127,700
-
$
02: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$114,832
Cost:
$600
- - - - - - $114,832 44,856 - - -
-
kWh
-
-
kW-months/year
-
-
$
$114,832
44,856
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$43,523
Cost:
$3,525
$40,822 919,988 $2,701 492 - - - - - - $40,822
919,988
kWh
$2,701
492
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$38,785
Cost:
$45,275
$32,748 737,725 $6,037 1,104 - - - - - - $32,748
737,725
kWh
$6,037
1,104
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$26,070
Cost:
$28,457
$21,700 488,863 $4,370 797 - - - - - - $21,700
488,863
kWh
$4,370
797
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,870
Cost:
$18,000
$14,300 322,098 $2,570 5,532 - - - - - - $14,300
322,098
kWh
$2,570
5,532
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,282
Cost:
$11,900
- - - - $4,282 - - - - - -
-
kWh
-
-
kW-months/year
$4,282
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$365,662
Cost:
$360,557
$104,130 2,345,872 $14,718 7,750 $4,282 - $114,832 44,856 $127,700 - $104,130
2,345,872
kWh
$14,718
7,750
kW-months/year
$4,282
-
$
$114,832
44,856
MMBtu
$127,700
-
$
TOTAL IMPLEMENTED Savings:
$240,080
Cost:
$95,857
$109,570 2,468,674 $15,678 7,925 - - $114,832 44,856 - - $109,570
2,468,674
kWh
$15,678
7,925
kW-months/year
-
-
$
$114,832
44,856
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Wood Personnel Changes Electricity Usage Electricity Demand Electricity Fees Wood Personnel Changes