IAC logo
IAC Assessment: OR0385
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0385
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Fresh/Frozen Seafood
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 30,500
Annual Production 10,000,000 Pounds
Production Hrs. Annual 5,300
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,268 2,102,579 kWh $0.03
Electricity Demand $22,590 81,528 kW-months/year $0.28
Electricity Fees $4,771 - $ -
LPG $58,596 6,783 MMBtu $8.64
TOTAL ENERGY COSTS $158,225
RECOMMENDED SAVINGS* $37,648 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,249
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees LPG Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ Tgal
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$10,600
Cost:
$58,000
- - - - - - - - $10,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$10,600
-
$
-
-
$
-
-
Tgal
02: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$9,076
Cost:
$12,220
$(-390) (-11,430) $(-152) (-47) - - - - - - $(-602) - $10,220 - $(-390)
(-11,430)
kWh
$(-152)
(-47)
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$(-602)
-
$
$10,220
-
Tgal
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$7,231
Cost:
$600
- - - - - - $7,231 833 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,231
833
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,053
Cost:
-
$3,053 88,804 - - - - - - - - - - - - $3,053
88,804
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,380
Cost:
-
$2,380 69,461 - - - - - - - - - - - - $2,380
69,461
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$670
Cost:
$1,900
- - - - $670 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$670
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,638
Cost:
$10,431
$3,545 103,165 $1,093 337 - - - - - - - - - - $3,545
103,165
kWh
$1,093
337
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$37,648
Cost:
$83,151
$8,588 250,000 $941 290 $670 - $7,231 833 $10,600 - $(-602) - $10,220 - $8,588
250,000
kWh
$941
290
kW-months/year
$670
-
$
$7,231
833
MMBtu
$10,600
-
$
$(-602)
-
$
$10,220
-
Tgal
TOTAL IMPLEMENTED Savings:
$14,249
Cost:
$11,031
$5,925 172,626 $1,093 337 - - $7,231 833 - - - - - - $5,925
172,626
kWh
$1,093
337
kW-months/year
-
-
$
$7,231
833
MMBtu
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees LPG Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees LPG Personnel Changes Ancillary Material Cost Water Consumption