IAC logo
IAC Assessment: OR0393
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0393
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2001
Principal Product TV/VCR and or DVD combo units
NAICS n/a
SIC 3651 - Household Audio And Video Equipment
Sales $100,000,000-$500,000,000
# of Employees 497
Plant Area (Sq.Ft.) 394,500
Annual Production 1,300,000 Pieces
Production Hrs. Annual 5,880
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $390,631 11,832,850 kWh $0.03
Electricity Demand $98,310 280,080 kW-months/year $0.35
Natural Gas $405,176 59,419 MMBtu $6.82
TOTAL ENERGY COSTS $906,098
RECOMMENDED SAVINGS* $1,248,937 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.426 MODIFY WORKLOAD Savings:
$100,000
Cost:
$15,300
- - - - - - $100,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$100,000
-
$
-
-
$
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,120,240
Cost:
$662,000
$42,400 825,944 - - $620,340 55,822 $300,000 - $157,500 - $42,400
825,944
kWh
-
-
kW-months/year
$620,340
55,822
MMBtu
$300,000
-
$
$157,500
-
$
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,734
Cost:
$1,500
$1,450 41,425 $284 56 - - - - - - $1,450
41,425
kWh
$284
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$13,247
Cost:
$17,800
$11,273 322,089 $1,974 395 - - - - - - $11,273
322,089
kWh
$1,974
395
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,716
Cost:
$26,090
$10,182 290,492 $3,534 708 - - - - - - $10,182
290,492
kWh
$3,534
708
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,248,937
Cost:
$722,690
$65,305 1,479,950 $5,792 1,159 $620,340 55,822 $400,000 - $157,500 - $65,305
1,479,950
kWh
$5,792
1,159
kW-months/year
$620,340
55,822
MMBtu
$400,000
-
$
$157,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material