IAC logo
IAC Assessment: OR0398
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0398
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2001
Principal Product Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 2,178,008
Annual Production 39,910,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,876 11,412,000 kWh $0.02
Electricity Demand $160,506 347,040 kW-months/year $0.46
Electricity Fees $12,859 - $ -
TOTAL ENERGY COSTS $455,241
RECOMMENDED SAVINGS* $1,538,074 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,074
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
01: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$1,495,000
Cost:
$2,000,000
- - - - - - $190,000 - $(-150,000) - $1,455,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$190,000
-
$
$(-150,000)
-
$
$1,455,000
-
%
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,011
Cost:
$85,079
$20,011 810,179 - - - - - - - - - - $20,011
810,179
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,184
Cost:
$12,000
- - - - $12,184 - - - - - - - -
-
kWh
-
-
kW-months/year
$12,184
-
$
-
-
$
-
-
$
-
-
%
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,080
Cost:
$37,263
$5,678 229,880 $4,402 793 - - - - - - - - $5,678
229,880
kWh
$4,402
793
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$799
Cost:
$800
$494 20,000 $305 55 - - - - - - - - $494
20,000
kWh
$305
55
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,538,074
Cost:
$2,135,142
$26,183 1,060,059 $4,707 848 $12,184 - $190,000 - $(-150,000) - $1,455,000 - $26,183
1,060,059
kWh
$4,707
848
kW-months/year
$12,184
-
$
$190,000
-
$
$(-150,000)
-
$
$1,455,000
-
%
TOTAL IMPLEMENTED Savings:
$43,074
Cost:
$135,142
$26,183 1,060,059 $4,707 848 $12,184 - - - - - - - $26,183
1,060,059
kWh
$4,707
848
kW-months/year
$12,184
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Increase in Production