IAC logo
IAC Assessment: OR0412
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0412
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product Doors and Cabnets
NAICS n/a
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Thousand Feet
Production Hrs. Annual 4,886
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,664 2,999,000 kWh $0.05
Electricity Demand $62,698 12,696 kW-months/year $4.94
Electricity Fees $1,075 - $ -
Natural Gas $24,492 2,623 MMBtu $9.34
TOTAL ENERGY COSTS $265,469
RECOMMENDED SAVINGS* $94,231 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,931
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$23,700
Cost:
$62,500
$20,400 446,659 $3,300 672 - - - - - - $20,400
446,659
kWh
$3,300
672
kW-months/year
-
-
$
-
-
$
-
-
%
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,100
Cost:
$31,375
$6,100 134,941 $2,000 400 - - - - - - $6,100
134,941
kWh
$2,000
400
kW-months/year
-
-
$
-
-
$
-
-
%
03: 2.5125 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE Savings:
$16,900
Cost:
$33,800
$3,300 75,542 $1,000 216 $3,300 - $9,300 - - - $3,300
75,542
kWh
$1,000
216
kW-months/year
$3,300
-
$
$9,300
-
$
-
-
%
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$35,400
Cost:
$2,900
- - - - - - - - $35,400 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$35,400
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,825
Cost:
$8,000
$5,015 182,365 $2,810 569 - - - - - - $5,015
182,365
kWh
$2,810
569
kW-months/year
-
-
$
-
-
$
-
-
%
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,306
Cost:
$4,970
$1,494 32,791 $812 164 - - - - - - $1,494
32,791
kWh
$812
164
kW-months/year
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$94,231
Cost:
$143,545
$36,309 872,298 $9,922 2,021 $3,300 - $9,300 - $35,400 - $36,309
872,298
kWh
$9,922
2,021
kW-months/year
$3,300
-
$
$9,300
-
$
$35,400
-
%
TOTAL IMPLEMENTED Savings:
$41,931
Cost:
$106,845
$33,009 796,756 $8,922 1,805 - - - - - - $33,009
796,756
kWh
$8,922
1,805
kW-months/year
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production