IAC Assessment: OR0417
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0417
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product window glass
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 7,950 Thousand Feet
Production Hrs. Annual 6,120
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $698,498 12,333,687 kWh $0.06
Electricity Demand $21,616 54,036 kW-months/year $0.40
TOTAL ENERGY COSTS $720,114
RECOMMENDED SAVINGS* $60,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,584
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$26,500
Cost:
-
$26,500 467,900 - - - - $26,500
467,900
kWh
-
-
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,232
Cost:
-
$7,232 127,720 - - - - $7,232
127,720
kWh
-
-
kW-months/year
-
-
$
03: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$6,232
Cost:
$900
$6,232 110,058 - - - - $6,232
110,058
kWh
-
-
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,086
Cost:
$19,050
$7,763 137,088 $323 806 - - $7,763
137,088
kWh
$323
806
kW-months/year
-
-
$
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,731
Cost:
$1,800
$2,044 36,108 - - $687 - $2,044
36,108
kWh
-
-
kW-months/year
$687
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,389
Cost:
$26,990
$9,356 165,210 $33 82 - - $9,356
165,210
kWh
$33
82
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$60,170
Cost:
$48,740
$59,127 1,044,084 $356 888 $687 - $59,127
1,044,084
kWh
$356
888
kW-months/year
$687
-
$
TOTAL IMPLEMENTED Savings:
$25,584
Cost:
$29,690
$24,864 439,096 $33 82 $687 - $24,864
439,096
kWh
$33
82
kW-months/year
$687
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost