IAC logo
IAC Assessment: OR0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0418
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product roofing material
NAICS n/a
SIC 2952 - Asphalt Felts And Coatings
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Tons
Production Hrs. Annual 7,056
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,009 5,858,800 kWh $0.03
Electricity Demand $51,783 10,860 kW-months/year $4.77
Electricity Fees $1,614 - $ -
Natural Gas $324,311 78,356 MMBtu $4.14
TOTAL ENERGY COSTS $562,717
RECOMMENDED SAVINGS* $15,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,409
Cost:
$1,400
$1,174 37,178 $235 48 - - - - $1,174
37,178
kWh
$235
48
kW-months/year
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,865
Cost:
$7,600
$5,623 178,068 $1,242 264 - - - - $5,623
178,068
kWh
$1,242
264
kW-months/year
-
-
$
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,090
Cost:
$1,800
$751 23,756 - - - - $339 - $751
23,756
kWh
-
-
kW-months/year
-
-
$
$339
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$929
Cost:
$1,500
- - - - $929 - - - -
-
kWh
-
-
kW-months/year
$929
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,707
Cost:
$9,446
$1,616 51,290 $3,091 648 - - - - $1,616
51,290
kWh
$3,091
648
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$15,000
Cost:
$21,746
$9,164 290,292 $4,568 960 $929 - $339 - $9,164
290,292
kWh
$4,568
960
kW-months/year
$929
-
$
$339
-
$
TOTAL IMPLEMENTED Savings:
$15,000
Cost:
$21,746
$9,164 290,292 $4,568 960 $929 - $339 - $9,164
290,292
kWh
$4,568
960
kW-months/year
$929
-
$
$339
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost