IAC logo
IAC Assessment: OR0423
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0423
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product Gold Dore
NAICS 212221 - Gold Ore Mining
SIC 1041 - Gold Ores
Sales $100,000,000-$500,000,000
# of Employees 414
Plant Area (Sq.Ft.) 0
Annual Production 66,875 Pounds
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,015,600 15,890,800 kWh $0.06
Electricity Demand $89,352 29,772 kW-months/year $3.00
Other Energy $(-72,060) (-12,675) MMBtu $5.69
TOTAL ENERGY COSTS $1,032,892
RECOMMENDED SAVINGS* $1,543,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,700
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Energy Increase in Production Electricity Usage Electricity Demand Other Energy Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$518,000
Cost:
$300,000
$518,000 8,104,000 - - - - - - $518,000
8,104,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
02: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$489,000
Cost:
$410,000
- - - - - - $489,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$489,000
-
%
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$183,000
Cost:
$120,860
$169,300 2,650,000 $13,700 3,708 - - - - $169,300
2,650,000
kWh
$13,700
3,708
kW-months/year
-
-
MMBtu
-
-
%
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$35,800
Cost:
$20,700
- - $35,800 9,600 - - - - -
-
kWh
$35,800
9,600
kW-months/year
-
-
MMBtu
-
-
%
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$38,900
Cost:
-
- - - - $38,900 9,240 - - -
-
kWh
-
-
kW-months/year
$38,900
9,240
MMBtu
-
-
%
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$279,200
Cost:
$2,000,000
$328,600 5,137,000 $61,600 16,464 $(-111,000) (-21,900) - - $328,600
5,137,000
kWh
$61,600
16,464
kW-months/year
$(-111,000)
(-21,900)
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$1,543,900
Cost:
$2,851,560
$1,015,900 15,891,000 $111,100 29,772 $(-72,100) (-12,660) $489,000 - $1,015,900
15,891,000
kWh
$111,100
29,772
kW-months/year
$(-72,100)
(-12,660)
MMBtu
$489,000
-
%
TOTAL IMPLEMENTED Savings:
$74,700
Cost:
$20,700
- - $35,800 9,600 $38,900 9,240 - - -
-
kWh
$35,800
9,600
kW-months/year
$38,900
9,240
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Other Energy Increase in Production Electricity Usage Electricity Demand Other Energy Increase in Production