Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2002 |
Principal Product | Gold Dore |
NAICS | 212221 - Gold Ore Mining |
SIC | 1041 - Gold Ores |
Sales | $100,000,000-$500,000,000 |
# of Employees | 414 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 66,875 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,015,600 | 15,890,800 | kWh | $0.06 |
Electricity Demand | $89,352 | 29,772 | kW-months/year | $3.00 |
Other Energy | $(-72,060) | (-12,675) | MMBtu | $5.69 |
TOTAL ENERGY COSTS | $1,032,892 | |||
RECOMMENDED SAVINGS* | $1,543,900 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $74,700 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Energy | Increase in Production | Electricity Usage | Electricity Demand | Other Energy | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $518,000 Cost: $300,000 |
$518,000 | 8,104,000 | - | - | - | - | - | - |
$518,000 8,104,000 kWh |
- - kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $489,000 Cost: $410,000 |
- | - | - | - | - | - | $489,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$489,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $183,000 Cost: $120,860 |
$169,300 | 2,650,000 | $13,700 | 3,708 | - | - | - | - |
$169,300 2,650,000 kWh |
$13,700 3,708 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $35,800 Cost: $20,700 |
- | - | $35,800 | 9,600 | - | - | - | - |
- - kWh |
$35,800 9,600 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $38,900 Cost: - |
- | - | - | - | $38,900 | 9,240 | - | - |
- - kWh |
- - kW-months/year |
$38,900 9,240 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $279,200 Cost: $2,000,000 |
$328,600 | 5,137,000 | $61,600 | 16,464 | $(-111,000) | (-21,900) | - | - |
$328,600 5,137,000 kWh |
$61,600 16,464 kW-months/year |
$(-111,000) (-21,900) MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,543,900 Cost: $2,851,560 |
$1,015,900 | 15,891,000 | $111,100 | 29,772 | $(-72,100) | (-12,660) | $489,000 | - | $1,015,900 15,891,000 kWh |
$111,100 29,772 kW-months/year |
$(-72,100) (-12,660) MMBtu |
$489,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $74,700 Cost: $20,700 |
- | - | $35,800 | 9,600 | $38,900 | 9,240 | - | - | - - kWh |
$35,800 9,600 kW-months/year |
$38,900 9,240 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Energy | Increase in Production | Electricity Usage | Electricity Demand | Other Energy | Increase in Production |