IAC logo
IAC Assessment: OR0436
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0436
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Custom Cabinets
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 0
Annual Production 216,750 Pieces
Production Hrs. Annual 2,168
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $188,670 3,425,380 kWh $0.06
Electricity Demand $40,578 138,720 kW-months/year $0.29
Electricity Fees $1,471 - $ -
Natural Gas $65,539 9,851 MMBtu $6.65
TOTAL ENERGY COSTS $296,258
RECOMMENDED SAVINGS* $77,419 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,579
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,500
Cost:
$7,680
$14,300 258,000 $2,200 814 - - $14,300
258,000
kWh
$2,200
814
kW-months/year
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,530
Cost:
-
$1,310 23,800 $220 80 - - $1,310
23,800
kWh
$220
80
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,840
Cost:
$3,000
$2,500 45,000 $340 120 - - $2,500
45,000
kWh
$340
120
kW-months/year
-
-
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,380
Cost:
$6,780
$7,800 141,000 $580 204 - - $7,800
141,000
kWh
$580
204
kW-months/year
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$48,169
Cost:
$66,400
$11,800 214,500 $(-331) (-120) $36,700 5,890 $11,800
214,500
kWh
$(-331)
(-120)
kW-months/year
$36,700
5,890
MMBtu
TOTAL RECOMMENDED Savings:
$77,419
Cost:
$83,860
$37,710 682,300 $3,009 1,098 $36,700 5,890 $37,710
682,300
kWh
$3,009
1,098
kW-months/year
$36,700
5,890
MMBtu
TOTAL IMPLEMENTED Savings:
$74,579
Cost:
$80,860
$35,210 637,300 $2,669 978 $36,700 5,890 $35,210
637,300
kWh
$2,669
978
kW-months/year
$36,700
5,890
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas