IAC logo
IAC Assessment: OR0440
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0440
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Frozen Onions, Peppers
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 27,520
Annual Production 62,900,000 Pounds
Production Hrs. Annual 8,211
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $453,824 11,793,346 kWh $0.04
Electricity Demand $61,811 23,328 kW-months/year $2.65
Electricity Fees $30,560 - $ -
Natural Gas $140,358 25,498 MMBtu $5.50
TOTAL ENERGY COSTS $686,553
RECOMMENDED SAVINGS* $1,896,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,877,400
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,842,800
Cost:
$348,000
$(-37,200) (-1,279,500) - - - - $(-187,000) - $(-1,163,000) - $3,230,000 - $(-37,200)
(-1,279,500)
kWh
-
-
kW-months/year
-
-
MMBtu
$(-187,000)
-
$
$(-1,163,000)
-
$
$3,230,000
-
$
02: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$15,000
Cost:
$75
- - - - - - $15,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,000
-
$
-
-
$
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$16,500
Cost:
$5,130
$16,500 567,000 - - - - - - - - - - $16,500
567,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,500
Cost:
-
$3,000 103,000 $500 144 - - - - - - - - $3,000
103,000
kWh
$500
144
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$2,600
Cost:
$700
- - - - $2,600 737 - - - - - - -
-
kWh
-
-
kW-months/year
$2,600
737
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$765
Cost:
$1,300
$765 26,080 - - - - - - - - - - $765
26,080
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$15,500
Cost:
$38,200
$12,600 427,000 $2,900 806 - - - - - - - - $12,600
427,000
kWh
$2,900
806
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,896,665
Cost:
$393,405
$(-4,335) (-156,420) $3,400 950 $2,600 737 $(-172,000) - $(-1,163,000) - $3,230,000 - $(-4,335)
(-156,420)
kWh
$3,400
950
kW-months/year
$2,600
737
MMBtu
$(-172,000)
-
$
$(-1,163,000)
-
$
$3,230,000
-
$
TOTAL IMPLEMENTED Savings:
$1,877,400
Cost:
$392,030
$(-8,100) (-285,500) $2,900 806 $2,600 737 $(-187,000) - $(-1,163,000) - $3,230,000 - $(-8,100)
(-285,500)
kWh
$2,900
806
kW-months/year
$2,600
737
MMBtu
$(-187,000)
-
$
$(-1,163,000)
-
$
$3,230,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product