IAC Assessment: OR0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Powdered Milk
NAICS 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023 - Dry, Condensed, Evaporated Products
Sales $50,000,000-$100,000,000
# of Employees 53
Plant Area (Sq.Ft.) 0
Annual Production 86,000,000 Pounds
Production Hrs. Annual 6,935
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $584,927 20,131,035 kWh $0.03
Electricity Demand $110,397 32,281 kW-months/year $3.42
Electricity Fees $10,796 - $ -
Natural Gas $2,394,495 340,508 MMBtu $7.03
TOTAL ENERGY COSTS $3,100,615
RECOMMENDED SAVINGS* $107,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $107,800
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$65,260
Cost:
$70,100
- - - - $660 95 $64,600 - -
-
kWh
-
-
kW-months/year
$660
95
MMBtu
$64,600
-
$
02: 2.2114 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE Savings:
$18,970
Cost:
$2,160
- - - - $18,970 2,725 - - -
-
kWh
-
-
kW-months/year
$18,970
2,725
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,670
Cost:
$985
- - - - $4,670 675 - - -
-
kWh
-
-
kW-months/year
$4,670
675
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$18,900
Cost:
$10,080
$15,800 543,550 $3,100 914 - - - - $15,800
543,550
kWh
$3,100
914
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$107,800
Cost:
$83,325
$15,800 543,550 $3,100 914 $24,300 3,495 $64,600 - $15,800
543,550
kWh
$3,100
914
kW-months/year
$24,300
3,495
MMBtu
$64,600
-
$
TOTAL IMPLEMENTED Savings:
$107,800
Cost:
$83,325
$15,800 543,550 $3,100 914 $24,300 3,495 $64,600 - $15,800
543,550
kWh
$3,100
914
kW-months/year
$24,300
3,495
MMBtu
$64,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product