IAC logo
IAC Assessment: OR0446
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0446
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Door Frame Parts
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 0
Annual Production 27,100,000 Thousand Feet
Production Hrs. Annual 0
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,292 7,745,142 kWh $0.04
Electricity Demand $97,026 290,352 kW-months/year $0.33
Electricity Fees $7,867 - $ -
Natural Gas $57,446 8,607 MMBtu $6.67
TOTAL ENERGY COSTS $454,631
RECOMMENDED SAVINGS* $585,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,680
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$508,000
Cost:
$28,000
- - - - - - - - $508,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$508,000
-
$
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$9,000
Cost:
$8,100
$9,000 246,000 - - - - - - - - $9,000
246,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$21,800
Cost:
$21,600
$15,200 415,000 $6,600 1,656 - - - - - - $15,200
415,000
kWh
$6,600
1,656
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,100
Cost:
$13,000
$11,500 314,000 $1,600 408 - - - - - - $11,500
314,000
kWh
$1,600
408
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$27,050
Cost:
$98,000
$12,609 203,800 $6,013 1,500 $406 - $8,022 - - - $12,609
203,800
kWh
$6,013
1,500
kW-months/year
$406
-
$
$8,022
-
$
-
-
$
06: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$6,780
Cost:
$26,000
$(-2,870) (-92,500) - - $1,440 - $8,210 - - - $(-2,870)
(-92,500)
kWh
-
-
kW-months/year
$1,440
-
$
$8,210
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$585,730
Cost:
$194,700
$45,439 1,086,300 $14,213 3,564 $1,846 - $16,232 - $508,000 - $45,439
1,086,300
kWh
$14,213
3,564
kW-months/year
$1,846
-
$
$16,232
-
$
$508,000
-
$
TOTAL IMPLEMENTED Savings:
$50,680
Cost:
$68,700
$32,830 882,500 $8,200 2,064 $1,440 - $8,210 - - - $32,830
882,500
kWh
$8,200
2,064
kW-months/year
$1,440
-
$
$8,210
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Primary Product