IAC Assessment: OR0452
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0452
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Corrugated Cardboard
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 516,478
Annual Production 869,000,000 Thousand Feet
Production Hrs. Annual 6,600
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,437 5,677,080 kWh $0.04
Electricity Demand $47,231 10,933 kW-months/year $4.32
Electricity Fees $18,203 - $ -
Natural Gas $250,311 51,539 MMBtu $4.86
TOTAL ENERGY COSTS $554,182
RECOMMENDED SAVINGS* $124,535 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$106,000
Cost:
-
- - - - - - $106,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$106,000
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,280
Cost:
$7,540
$5,040 120,000 $1,240 287 - - - - $5,040
120,000
kWh
$1,240
287
kW-months/year
-
-
MMBtu
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,335
Cost:
$4,025
$2,335 60,700 - - - - - - $2,335
60,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$900
Cost:
$900
$900 20,000 - - - - - - $900
20,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,600
Cost:
$4,000
$3,000 71,000 $600 148 - - - - $3,000
71,000
kWh
$600
148
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$5,420
Cost:
$7,880
$880 107 - - $4,540 684 - - $880
107
kWh
-
-
kW-months/year
$4,540
684
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$124,535
Cost:
$24,345
$12,155 271,807 $1,840 434 $4,540 684 $106,000 - $12,155
271,807
kWh
$1,840
434
kW-months/year
$4,540
684
MMBtu
$106,000
-
$
TOTAL IMPLEMENTED Savings:
$118,600
Cost:
$16,320
$6,820 140,107 $1,240 287 $4,540 684 $106,000 - $6,820
140,107
kWh
$1,240
287
kW-months/year
$4,540
684
MMBtu
$106,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product