Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Dried veneer
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $1,000,000-$5,000,000
# of Employees 100
Plant Area (Sq.Ft.) 95,000
Annual Production 1,113,000 Pieces
Production Hrs. Annual 8,320
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $305,246 7,789,100 kWh $0.04
Electricity Demand $76,971 16,565 kW-months/year $4.65
Electricity Fees $23,558 - $ -
Natural Gas $1,209,141 233,877 MMBtu $5.17
TOTAL ENERGY COSTS $1,614,916
RECOMMENDED SAVINGS* $65,290 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,550
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$(-1,300)
Cost:
$5,000
$(-1,107) (-28,288) $(-193) (-41) - - - - - - $(-1,107)
(-28,288)
kWh
$(-193)
(-41)
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$37,240
Cost:
$1,760
- - - - - - $39,000 8,200 $(-1,760) - -
-
kWh
-
-
kW-months/year
-
-
$
$39,000
8,200
MMBtu
$(-1,760)
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$12,900
Cost:
$2,410
- - - - - - $12,900 2,720 - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,900
2,720
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,900
Cost:
$12,600
- - - - $4,900 - - - - - -
-
kWh
-
-
kW-months/year
$4,900
-
$
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,550
Cost:
$15,400
$9,740 248,900 $1,810 383 - - - - - - $9,740
248,900
kWh
$1,810
383
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$65,290
Cost:
$37,170
$8,633 220,612 $1,617 342 $4,900 - $51,900 10,920 $(-1,760) - $8,633
220,612
kWh
$1,617
342
kW-months/year
$4,900
-
$
$51,900
10,920
MMBtu
$(-1,760)
-
$
TOTAL IMPLEMENTED Savings:
$11,550
Cost:
$15,400
$9,740 248,900 $1,810 383 - - - - - - $9,740
248,900
kWh
$1,810
383
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $