IAC Assessment: OR0458
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0458
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Plastic Food Containers
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 140,000
Annual Production 350,000 Pieces
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,396 3,015,120 kWh $0.04
Electricity Demand $46,902 89,340 kW-months/year $0.52
Electricity Fees $864 - $ -
Natural Gas $53,451 39,061 MMBtu $1.37
TOTAL ENERGY COSTS $227,613
RECOMMENDED SAVINGS* $91,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Primary Product Electricity Usage Electricity Demand Electricity Fees Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 4.4260 MODIFY WORKLOAD Savings:
$60,800
Cost:
$480
- - - - - - $60,800 - -
-
kWh
-
-
kW-months/year
-
-
$
$60,800
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,440
Cost:
$7,400
- - - - $9,440 - - - -
-
kWh
-
-
kW-months/year
$9,440
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,200
Cost:
$4,600
$7,200 117,000 - - - - - - $7,200
117,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,300
Cost:
$6,000
$5,100 121,000 $1,200 193 - - - - $5,100
121,000
kWh
$1,200
193
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,800
Cost:
-
$2,300 56,000 $500 78 - - - - $2,300
56,000
kWh
$500
78
kW-months/year
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,880
Cost:
$3,000
$3,820 91,000 $1,060 168 - - - - $3,820
91,000
kWh
$1,060
168
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,420
Cost:
$21,480
$18,420 385,000 $2,760 439 $9,440 - $60,800 - $18,420
385,000
kWh
$2,760
439
kW-months/year
$9,440
-
$
$60,800
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Primary Product Electricity Usage Electricity Demand Electricity Fees Primary Product